Similar Projects
Madison Chocolate Company
Build-Out, Alteration - 3,125 SF
Design
Madison, WI 53719

Walnut Grove Single Track Trail Improvements 2022
Infrastructure
Bidding
$200,000 est. value
Madison, WI

Olin-Turville Court and East Lakeside Street Resurfacing Water Utilities
Infrastructure
Bidding
$700,000 est. value
Madison, WI 53715

2021 Road Sealcoating
Post-Bid
Marshall, WI

Seal coating
Post-Bid
Blue Mounds, WI

Cedar Street Assessment District - 2021 And South Street, High Street, And West Wingra Drive Assessment District - 2021
Renovation
Results
$4,348,305 est. value
Madison, WI 53715

Cedar Street Assessment District - 2021 And South Street, High Street, And West Wingra Drive Assessment District - 2021
Renovation
Results
$4,348,305 est. value
Madison, WI 53715

Walking Path Rock Removal
Alteration
Construction
$111,240 est. value
Madison, WI 53715

Willow Street and East Street Water Main Reconstruction
Infrastructure
Bidding
$660,000 est. value
Morrisonville, WI

Hydrants
Infrastructure
Post-Bid
Madison, WI

Deforest - North Street Reconstruction
Results
$750,000 est. value
DeForest, WI 53532

Sun Prairie Utilities 2022 LSL Assistance
Infrastructure
Bidding
$470,000 est. value
Sun Prairie, WI

Curb Boxes
Infrastructure
Post-Bid
Madison, WI

Dahl Drive Drainage and Street Reconstruction
Results
$930,000 est. value
DeForest, WI 53532

Ductile Iron Pipe
Infrastructure
Post-Bid
Madison, WI

Last Updated 06/02/2022 12:47 AM
Project Title

South Syene Road Reconstruction (Aurora to Nannyberry Park) Project

Physical Address View project details and contacts
City, State (County) Fitchburg, WI 53711   (Dane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $376,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bids will be received for the proposed work which generally consists of reconstruction of approximately 5,100 feet of roadway including Syene Road from Aurora Avenue to Nannyberry Park, intersection improvements, traffic control, pavement marking & signing, erosion control, storm sewer, sanitary sewer, watermain, stormwater management, lighting, traffic signals, and all appurtenant work. The majority of the work consists of the following items: 33,400 cubic yards of excavation common, 23,800 square feet of concrete sidewalk, 11,300 linear feet of concrete curb and gutter, 25,700 ton of base aggregate dense, 9,300 ton of select crushed material, 4,300 ton of HMA pavement 3 MT 58-28 S, 3,200 ton of HMA 5 MT 58-28 S, 3,300 linear feet of storm sewer pipe reinforced concrete, and all other work for the Syene Road Reconstruction Project in the City of Fitchburg, Dane County, Wisconsin. The City of Fitchburg reserves the right to reject any or all Bids, to waive any informalities in bidding, and to award the Contract in the best interests of the City. No Bid shall be withdrawn for a period of 60 days after the actual time of opening Bids.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents