Similar Projects
Fort Wayne International Airport Site Improvements
Infrastructure
Bidding
Fort Wayne, IN 46809

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Bidding

Engineering Services for 2021 Site Improvements @ Haley Elementary School
Post-Bid
Fort Wayne, IN 46802

Homestead High School Phase 2A Early Release Packages
Renovation, Addition
Post-Bid
Fort Wayne, IN 46814

Walnut & Main Streets Improvements
Results
Leo-Cedarville, IN 46765

2020 Resurfacing Package Southwest
Results
Fort Wayne, IN 46802

Alleys East/West and North/South: Emasterson Avenue, East Williams Street, South Clinton Street, South Calhoun South
Infrastructure
Bidding
Fort Wayne, IN 46895

Information Request from Engineers for the Removal of Asphalt Gore Areas and Replacement
Post-Bid
Fort Wayne, IN 46802

2020 HMA Resurface Hursh Road
Results
Fort Wayne, IN 46802

City Utilities Asphalt Cut Repairs
Term Contract
Post-Bid
Fort Wayne, IN

Road Reconstruction
Results
IN

City Utilities Concrete Cut Repair Service
Term Contract
Post-Bid
Fort Wayne, IN

Concrete Pad for Vactor Dumping Area
Results
Fort Wayne, IN 46802

EACS 2021 Paving
Post-Bid
New Haven, IN

Alley Reconstruction
Results
Fort Wayne, IN 46800

Last Updated 08/09/2021 02:07 PM
Project Title

Harvester Community Concrete Street Repairs, Phase 1

Physical Address View project details and contacts
City, State (County) Fort Wayne, IN 46803   (Allen County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of the existing concrete street of Reynolds Street from Esdall Avenue to Shady Brook Drive (abandoned) and Edsall Avenue from Reynolds Street to approx. 75' south of Reynolds Street. Reconstruction of drive approaches and sidewalk as necessary. Subsurface drainage will be installed during construction, sewer castings will be adjusted and restoration of disturbed area

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents