Similar Projects
5th and U Pump Station Improvements and Backup Power
Renovation, Alteration
Bidding
$1,035,675 est. value
Salt Lake City, UT 84103

Sandy City Well and Pump Station Maintenance Services (2020/21)
Post-Bid
Sandy, UT 84070

6200 South Zone C Pump Station
Term Contract
Post-Bid
West Jordan, UT 84081

Virgin River Pumphouse Renovation
Renovation
Results
$200,000 to $500,000 est. value
Saint George, UT

Elk Ridge Oak Lane Booster Pump Station
Results
Less than $500,000 est. value
Elk Ridge, UT 84651

Construction of the Walmart Lift Station
Post-Bid
Richfield, UT

Washington Dam Outfall and East Lift Station
Results
Washington, UT 84780

Stonebridge Maintenance Variable Speed Pump Station Replacement
Post-Bid
West Valley City, UT 84120

Golden Hills Pump Station Rehabilitation
Results
$276,000 est. value
Cottonwood Heights, UT 84121

Concrete Lined Pond and Pump Station
Post-Bid
Highland, UT 84003

500 West Lift Station Rehabilitation
Results
$274,000 est. value
Salt Lake City, UT 84115

Industrial Lift Station Rehab and Piping Upgrades
Post-Bid
Salt Lake City, UT

2020 400 North Booster Station Project
Results
Less than $31,600 est. value
Bountiful, UT

Zone 2 and 3 Pump Station and Pipeline Project
Post-Bid
Herriman, UT 84096

Stubbs Sewer Lift Station
Results
Less than $160,000 est. value
Vernal, UT 84078

Reported 08/12/2021 03:11 PM
Project Title

City Creek Pump Station and Pipeline

Physical Address View project details and contacts
City, State (County) Saint George, UT   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method
Project Status Construction Complete as of September 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: Red Cliffs National Conservation Area, Washington County, Utah Sections 24 and 25, Township 41 South, Range 16 West; Sections 30, 31, and 32, Township 41 South, Range 15 West; and Sections 5, 6, 7, and 8, Township 42 South, Range 15 West Salt Lake Base and Meridian Construction of approximately 4.8 miles of 12-inch ductile iron and PVC water pipeline and appurtenances. The work also includes construction of a new 200 horsepower culinary water pump station enclosed in a concrete building

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents