Similar Projects
Francis Quadrangle - Steam Tunnel Repairs
Renovation
Bidding
$300,000 to $330,000 est. value
Columbia, MO

City Park Dam and Spillway Rehabilitation Project
Renovation
Post-Bid
Harrisonville, MO

Flapper Gates Replacement
Renovation
Post-Bid
Less than $69,000 est. value
Saint Joseph, MO

Harry S. Truman Dam and Reservoir Spillway Bridge Superstructure Girder Crack Repair
Renovation
Results
$25,000 to $100,000 est. value
Warsaw, MO 65355

Little Otter Creek Watershed Protection and Flood Prevention
New Construction
Post-Bid
MO

Repair Firepit Lake Dam Jay Nixon State Park
Results
Middle Brook, MO 63656

Last Updated 10/20/2021 09:33 AM
Project Title

Williams Creek Watershed Improvements

Physical Address View project details and contacts
City, State (County) High Ridge, Murphy, MO 63026   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status All Bids Rejected
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of 1112 lineal feet of 12" and 175 lineal feet of 8" Gravity Sewer Construction, 8 manholes, 470 lineal feet of 10" RJ force main with an air release valve assembly, two road bores, one creek crossing, lateral reconnection of 19 homes, 1,980 SY of concrete replacement, along with minor Asphalt repair and site restoration.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents