Similar Projects
SR 302 - Bridge Preservation
Infrastructure, Renovation
Design
$2,805,000 CJ est. value
Ashland, OH 44805

SR 302 - Bridge Preservation
Infrastructure, Renovation
Design
$2,805,000 CJ est. value
Ashland, OH 44805

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

Road Materials
Alteration
Post-Bid
Loudonville, OH

Road Oil
Infrastructure
Post-Bid
Perry, OH

Chip Seal- D10-Chip Seal FY2022 North
Infrastructure
Results

Ashland High School Stadium Track Surface Replacement Project
Alteration
Results
$368,500 est. value
Ashland, OH 44805

Bus Parking Lot - Black River Local School District
Renovation
Design
$500,000 CJ est. value
Sullivan, OH 44880

D03 FY2021 (B) Bridge Repair
Infrastructure
Bidding
$715,000 CJ est. value
Ashland, OH 44805

Seal Coating
Infrastructure
Post-Bid
OH

Chip Seal - D04-CHIP FY2022
Infrastructure
Results
$1,225,000 est. value

Roadway Major Rehab - US 545
Infrastructure
Design
$12,350,000 CJ est. value
Ashland, OH 44805

Road Materials
Infrastructure
Bidding
$200,000 CJ est. value
Loudonville, OH 44842

2021 Ashland County Sealing Program
Infrastructure
Post-Bid
$60,000 est. value
Ashland, OH

Last Updated 03/15/2023 08:06 AM
Project Title

SR 42 Roadway Minor Rehab

Physical Address View project details and contacts
City, State (County) Ashland, OH 44805   (Ashland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2024
Bids Due View project details and contacts
Estimated Value $3,851,649 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Resurfacing - Urban Paving City of AshlandUS42 - SLM 3.80 (Baney Rd.) to SLM 9.05 (Leave Ashland Corp)SR96 - SLM 03.91(Enter Ashland Corp) to SLM 05.45(Intersection SR60 (Main St.)) As of March 15, 2023, the project is in Design status. Anticipated letting date is May 09, 2024. OHDOT - SR 42 Roadway Minor Rehab *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents