Similar Projects
Dar Alnoor Expansion
Renovation, Addition - 76,276 SF
Conception
Manassas, VA 20122

Original Mount Vernon High School Renovation and Adaptive Reuse
Renovation
Design
$55,000,000 to $81,000,000 est. value
Alexandria, VA 22309

Poquoson Middle School Renovations - Design Development
Renovation - 92,625 SF
Design
$17,000,000 est. value
Poquoson, VA 23662

Edwards-Wilson Center Site Project
New Construction - 26,470 SF
Bidding
Chesapeake, VA 23324

Repurposing of Ralph Bunche School Property
Renovation
Bidding
King George, VA

Construction Manager Advisory Services for Various Arlington Public Schools Construction Projects
Post-Bid
Arlington, VA

Renovation of CTE Lab and New Switch Gear
Renovation
Post-Bid
Dublin, VA 24084

PPEA for Design-Build of New High School
New Construction
Results
South Boston, VA 24592

Job Order Contracting Services
Term Contract
Results
Newport News, VA 23606

Construction of a New Operations Center for Suffolk Public Schools
New Construction
Construction
$17,000,000 est. value
Suffolk, VA

Construction of the Westmoreland High School Replacement (Washington and Lee)
Construction
$44,500,000 est. value
Montross, VA 22520

Redevelopment Commissioning Services for New High School
New Construction - 320,425 SF
Post-Bid
$150,000,000 est. value
Alexandria, VA 22302

Locker Pod Conversions to Classrooms
Renovation
Results
$1,711,200 est. value
Chesterfield, VA 23838

Bradford Hall Renovations
Renovation - 3,166 SF
Construction
$1,359,000 est. value
Staunton, VA

FCPS School Renovation Capital Project
Renovation
Post-Bid
Winchester, VA

Reported 08/20/2021 12:00 AM
Project Title

Lebanon Middle School New Fieldhouse

Physical Address View project details and contacts
City, State (County) Lebanon, VA 24266   (Russell County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect/Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of an 8,320 SF new 2-story split face block and CMU exterior with CMU, metal stud and GWB interior walls, along with associated work.

Details

,, 16,640 SF - 1 Middle/Senior High School, 2 Stories Above Grade, 8,320 SF New Construction, 1 Middle/Senior High School, 2 Stories Above Grade, Approximately 8,320 SF New Construction.
Division 01 - General Requirements.
Division 02 - Existing Conditions, Demolition, Selective Site Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Sheathing.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents