Similar Projects
Dragonfly Boatworks Fencing Project
Alteration
Bidding
$38,200 est. value
Vero Beach, FL 32960

Systemwide Guardrail and Fencing Maintenance
Term Contract, Infrastructure
Bidding
FL

Construction of the Jet Blast Deflector Fence Project
Post-Bid
Sarasota, FL 34243

Chain Link Fencing
Post-Bid
FL

Repair/Renovate Cleveland Commercial Gate
Results
$1,000,000 to $5,000,000 est. value
Panama City, FL 32403

250` Pressure Treated Wooden Fence
Results
Panama City, FL 32408

Rock Road Jail Entrance Gate Upgrade
Alteration
Bidding
$50,000 est. value
Fort Pierce, FL 34945

Fencing, Gate Operators and Handrails - Tampa Bay Purchasing Cooperative Contract
Post-Bid
FL

Repair and Replace Fence
Results
Destin, FL 32540

Sports Complex Safety Netting
Alteration
Bidding
Belleview, Citra, Ocala, Silver Springs, FL 34420

Miscellaneous Fencing Projects
Post-Bid
Avon Park, Lake Placid, Sebring, FL 33870

6ft Black Aluminum Picket Fence for Perimeter of Flavet Field
Results
Gainesville, FL 32611

Chain-Link Fence And Gate Installation Services
Term Contract
Bidding
$30,000 est. value
Lakeland, FL 33809

Nancy Payton Preserve Fabricate and Install Welded Horse Gate
Post-Bid
Naples, FL 34117

Animal Services Fence
Results
Sanford, FL 32773

Reported 05/07/2022 12:00 AM
Project Title

Purchase and Install Silt Fence

Physical Address View project details and contacts
City, State (County) FL   (Lee County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all labor, material and equipment necessary to purchase and install gopher tortoise exclusion fencing on North Captiva per maps provided. These permits require the temporary installation of filter fabric (silt fencing) or other comparable fencing (buried at least eight inches into the ground) along the outer edge of the construction right-of-way to block tortoise re-entry into the corridor during construction activities. The silt fences for each Work Area will need to be installed prior to the removal of the gopher tortoises from that area, and their release on other side of temporary fencing into adjacent suitable habitat. Phase I has been divided up into eight separate Work Areas, with twenty-seven specific work locations.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents