Similar Projects
Housing Building Roof Replacement
Alteration
Bidding
$1,825,000 est. value
Shirley, MA 01464

Roofing System Replacement, Park Road Apartments 667-1
Alteration
Bidding
$37,000 est. value
Ashland, MA

Roof Replacement/Repair
Post-Bid
Less than $50,000 est. value
Stoneham, MA 02180

Siding and Roof Replacement to Fire Department Headquarters
Post-Bid
$75,000 to $100,000 est. value
Sherborn, MA

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement, 100 Cedar Street MA 13-4 & 46-48 Dale Street MA 13-6
Alteration
Bidding
$150,000 est. value
Waltham, MA

Roofing Envelope Services
Post-Bid

Roof Replacement, Accessibility Upgrades and Associated Work at the Greenwood School - Filed Sub Bids
Results
$1,075,000 to $1,125,000 est. value
Wakefield, MA

Roof Replacement Project at George P. Roger's Fire Station
Alteration
Bidding
$73,000 est. value
Westford, MA 01886

Bi-Annual Gutter and Downspout Cleaning
Term Contract
Post-Bid
Medford, MA

Roof Replacement Robert Flucker Heights
Results
$87,000 est. value
Tewksbury, MA 01876

Structural Repairs to the Anne Mcdonald Building and Replace an Attached Tunnel Roof
Alteration
Bidding
$150,000 est. value
Tewksbury, MA

Roofing MACC
Post-Bid

On-Call Roofing
Results
Lexington, MA

Last Updated 09/27/2021 04:01 PM
Project Title

Z2--Bldg. 1 Lobby Roof Replacement

Physical Address View project details and contacts
City, State (County) Natick, MA 01760   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New fully-adhered single-ply EPDM roofing system by an approved roof system manufacturer. Unless otherwise noted, all components of new roof shall be from same roof system and be compatible with all other components of same roof system. All details and methods of installation shall be in complete accordance with manufacturer's installation requirements. The Contractor shall perform all work required to provide a complete and watertight installation per the specifications and to meet all requirements necessary to obtain manufacturer's warranty as indicated. Roofing above lobby contains asbestos (see Attachment 7 “B1 Roof ACM Testing).

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents