Similar Projects
Building Renovations and Sanitary Sewer Upgrades at Seasonal Housing Facility
Renovation, Alteration - 12,000 SF
Design
Nantucket, MA

Contract 13 District H Well Station
Renovation, Infrastructure - 1,200 SF
Bidding
$2,400,000 est. value
Eastham, MA

Well and Pump Improvements
Infrastructure
Bidding
$170,000 est. value
Weymouth, MA

Sewer Pump Station On-Call Repair & Maintenance
Post-Bid
Less than $67,300 est. value
Burlington, MA

Well Cleaning
Post-Bid
Swansea, MA

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Church Lane Gravel Packed Well Redevelopment and Pump Repair
Results
Sagamore, MA

2022 Well Cleaning, Redevelopment and Pump Inspection Project
Infrastructure
Bidding
Webster, MA

Replace One Existing Pump
Post-Bid
$20,000 est. value
Palmer, MA 01069

Redevelopment, Surging and Chemical Treatment of Two (2) Gravel Packed Wells
Results
Wilmington, MA

Route 128 and Nickerson Field Wells
Infrastructure
Bidding
$100,000 est. value
Weston, MA

Furnish and Install a New Pump Bowl Assembly
Post-Bid
Less than $25,000 est. value
Shrewsbury, MA

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Cleaning and Redeveloping of Chestnut Well 3 and Cranberry Well
Post-Bid
Hudson, MA

Replacement Well 5A
Results
Less than $450,000 est. value
Dracut, MA

Reported 05/06/2022 12:00 AM
Project Title

FY23 Well Rehabilitation and Pump Maintenance

Physical Address View project details and contacts
City, State (County) North Attleborough, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $96,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents