Similar Projects
Citywide Sidewalk Improvements Phase II
Infrastructure
Bidding
$300,000 est. value
Doral, FL

Emergency Response for Sidewalk Repairs
Infrastructure
Bidding
$800,000 est. value
Miami, FL

Safe Route to Schools Locations Phase 22 FM 439895-1
Post-Bid
Less than $171,530 est. value
Hialeah, Miami Gardens, Opa-locka, FL 33014

Safe Route to Schools Locations Phase 21 FM 439894-1
Post-Bid
Less than $382,771 est. value
Miami, FL 33144

VCA/ADA Accessibility Improvements to Common Areas and Parking Spaces - 30 West 33rd / 35 West 32nd Street
Results
Hialeah, FL 33010

Construction of New Pedestrian Pathway at Fuchs Park
Results
Miami, FL 33143

Citywide Sidewalk Repair Services
Term Contract
Post-Bid
Less than $200,000 est. value
North Miami, FL

Surface Lot and Seawall at Biscayne Beach
Term Contract
Results
Less than $900,000 est. value
Miami Beach, FL 33141

Emergency Response for Sidewalk Repairs
Infrastructure
Post-Bid
$1,048,223 est. value
FL

North Beach Oceanside Park Beachwalk (from 79th to 87th Street)
Results
$3,950,500 est. value
Miami Beach, FL 33139

Bicycle Lane Separator
Infrastructure
Post-Bid
$416,946 est. value
Miami, Miami Beach, FL 33134

Pinecrest Gardens Lower Gardens ADA Complaint Pathway Construction
Results
Miami, FL 33156

Design-Build Services for the Underline - Phases 3 - 9
New Construction, Infrastructure
Post-Bid
$100,608,364 est. value
FL

Safe Routes to School (SRTS) Infrastructure Priority 2 - Coral Reef Elementary
Results
Palmetto Bay, FL 33157

Haulover Park - Boat Ramp and Parking Lot Project
Infrastructure
Post-Bid
$9,890,000 est. value
Miami Beach, FL 33154

Reported 05/26/2022 12:00 AM
Project Title

Sidewalk Improvements - Multiple Sites

Physical Address View project details and contacts
City, State (County) Miami, FL   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this Contract includes furnishing of all supervision, labor, materials, tools, equipment and performing all operations required to construct the Work in accordance with the Contract Documents. Work includes construction of new sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; reconstruction and/or repair of existing sidewalks, sidewalk connectors, driveway approaches, curb ramps, curbs and/or gutters; removal and disposal of various existing pavements, trees, tree roots and debris; grading and preparation of subgrade and sodding; and adjustment of existing utility valve covers to new finished grade. One or a combination of more than one of the work described herein may be required to be performed at any given site pursuant to the requirements of the Work Order governing the site. If any changes are required due to conflict of design and or field conditions, the Engineer will make the final determination. The Contractor and all subcontractors, under this Contract, are prohibited from performing any work, other than specified in the Contract and/or directed by the Engineer, within the limits of the project site, without prior written notification to the Engineer. This includes any work for private or commercial entities.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents