Similar Projects
Last Updated | 09/27/2022 09:32 PM |
Project Title | Storm Sewer Installation Along With Oil and Chip Pavement Removal and Replacement With PCC Pavement and Associated PCC Valley Gutter |
Physical Address | View project details and contacts |
City, State (County) | Pawnee, IL 62558 (Sangamon County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $220,233 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | City/County : Pawnee Description: Storm sewer installation along with oil & chip pavement removal and replacement with PCC pavement and associated PCC valleygutter. 15 Unit Tree Removal, (6 to 15 units Diameter) 236 Cubic Yard Earth Excavation 607 Square Yard Aggregate Base Course, Type B 6" 8 Square Yard Temporary Ramp 508 Square Yard Portland Cement Concrete Pavement 8" 96 Square Foot Portland Cement Concrete Sidewalk 4 Inch 96 Square Foot Sidewalk Removal 224 Foot Storm Sewers, Class A, Type 2 12" 154 Foot Storm Sewers, Class A, Type 2 15" 1 Each Water Valves to be Adjusted 1 Each Manholes, Type A, 4'-Diameter Type 3 Frame & Grate 1 Each Manholes, Type A, 4'-Diameter Type 9 Frame & Grate 1 Each Inlets, Type A, Type 3 Frame & Grate 2 Each Inlets, Type A, Type 9 Frame & Grate 1 Each Frames and Lids to be Adjusted 16 Foot Combination Concrete Curb & Gutter, Type B-6.24 2 Each Connection to Existing Drainage Structure 357 Foot Concrete Gutter (Special) 1 Lump Sum Traffic Control and Protection, (Special) 575 Square Yard Seeding (Complete) 12 Square Yard Class D Patches, Special Project Location: Grooms Street Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. IDOT - Storm Sewer Installation Along With Oil and Chip Pavement Removal and Replacement With PCC Pavement and Associated PCC Valley Gutter - 21-00015-00-PV |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |