Similar Projects
Public Works Maintenance Facility
Renovation
Bidding
$680,000 est. value
New Haven, CT 06511

Supply and Delivery of Wastewater Treatment Chemicals
Alteration
Bidding
Cheshire, CT

Storm Drainage Repair
Infrastructure
Post-Bid
$440,000 to $530,000 est. value
East Hartford, CT

Storm Sewer Installation Marion Street and Third Avenue
Infrastructure
Post-Bid
West Haven, CT

Citywide Stormwater Infrastructure Cleaning and Assessment Program
Term Contract
Results
Stamford, CT

Bartholomew Avenue Parkville TOD Stormwater Infrastructure and Streetscape Project
Results
Hartford, CT

Emergency Sewer System and Storm Water System Repair Services
Term Contract, Infrastructure
Post-Bid
Torrington, CT

Catch Basin and Storm System Pipe Cleaning
Results
Wallingford, CT

Pipesafe Protection Sewer Repair
Term Contract, Infrastructure
Post-Bid

WPCA2021-02 Belden Avenue Sewer Improvements
Results
Less than $85,000 est. value
Norwalk, CT 06854

Emergency Repair Services for Sewer and Storm Water Systems
Infrastructure
Post-Bid
Torrington, CT

Catch Basin Cleaning 2021
Results
Waterbury, CT

Stormwater Monitoring Services
Term Contract
Post-Bid
Hartford, CT

Citywide Maintenance and Repair of Various Drains and Pumps
Results
Stamford, CT

Miami Beach Sewers and Association Improvements Old Lyme, Connecticut
Infrastructure
Post-Bid
Old Lyme, CT

Reported 04/29/2022 12:00 AM
Project Title

Construction of the South Main Street Low Pressure Sewer Construction Project

Physical Address View project details and contacts
City, State (County) Marlborough, CT 06447   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes construction of approximately 400 linear feet of low-pressure sewer main, electrical inspections and upgrades, installation of one grinder pump, and HDPE low pressure service piping. The pipeline work includes all fittings, valves, pavement replacement, inlet protection, sediment and erosion control measures, and all other work indicated on the Contract Documents.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents