Similar Projects
On Call as Needed Plumbing Services
Bidding
Las Cruces, NM

Kitchen Plumbing Piping Replacement
Post-Bid
Shiprock, NM 87420

Plumbing Services
Post-Bid
Mora, NM 87732

HVAC and Plumbing Services District 6
Results
Santa Fe, NM

Plumbing Remodel at Central Elementary School
Results
Lordsburg, NM

Electrical, Heating, Plumbing for 2020/2021 School Year
Term Contract
Post-Bid
Less than $60,000 est. value
Questa, NM 87556

Plumbing Supplies
Results

Plumbing Services
Term Contract
Post-Bid
Albuquerque, NM 87125

Plastic Pipe
Term Contract
Results
Albuquerque, NM 87102

Plumbing Maintenance Services
Term Contract
Post-Bid
Pilar, Taos, NM 87571

Plumbing Services
Results
Pecos, NM 87552

Plumbing and HVAC Repair and Installation
Post-Bid
Estancia, NM 87016

Plumbing Maintenance Services
Post-Bid
Carrizozo, NM 88301

2020 Gas Furnace & Gas Heater Maintenance Project
Term Contract
Post-Bid
Santa Clara, NM 87532

Plastic Pipe
Term Contract
Post-Bid
Albuquerque, NM

Reported 11/08/2019 12:00 AM
Project Title

Kitchen Plumbing Piping Replacement

Physical Address View project details and contacts
City, State (County) Shiprock, NM   (San Juan County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work for the Kitchen Plumbing systems includes plumbing fixtures and traps, drainage and vent pipe (s), and building drains and sewers, including the respective joints and connection, devices, receptors, and appurtenances within the designated areas. 1. Identify waste water piping (actual) path lines and mark (interior and exterior) 2. Remove equipment and flooring from path line 3. Demolish floor to access piping and remove damaged piping (interior and exterior) 4. Prepare base per acceptable code requirements with correct compaction and slope 5. Install approximately 42’-4” interior piping Sch40 PVC (4” DIA) code compliant piping 6. Install approximately 60’ exterior piping SDR 35 PVC (4” DIA) code compliant piping to connect with 6” main 7. Replace various waste water lines connecting into the main line within the kitchen area, including lines to the grease trap with 2”, 3” and 4” Sch40 PVC. 8. Replace plumbing fixtures, traps, floor drains, drainage pipes, vent pipes, building drains, joints, connections, devices, receptors, and appurtenances. 9. Cross-Connection Control Backflow Prevention Device Testing and Repair. 10. Submit Demolition phase and time schedule for Main sewer line(s), Grease trap line(s). Coordinated kitchen drawings prior to the installation of piping.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents