Similar Projects
Grace Street Reconstruction - DPW1 - 2024- City of Platteville
Infrastructure
Conception
$665,000 CJ est. value
Platteville, WI 53818

Ann Street Reconstruction - DPW2-2025- City of Platteville
Infrastructure
Conception
$294,500 CJ est. value
Platteville, WI 53818

Badger Hollow II
New Construction, Infrastructure
Design
$195,000,000 CJ est. value
Montfort, WI 53569

Cuba City School District 2022 Bond - Elementary and High School
Addition, Demolition, Renovation, Infrastructure
Design
$36,000,000 CJ est. value
Cuba City, WI 53807

Township Building - Clifton Township
Renovation, Infrastructure - 4,800 SF
Bidding
$790,000 CJ est. value
Clifton, WI 53554

Muscoda Business Park Expansion
Addition, Infrastructure
Bidding
$10,000,000 CJ est. value
Muscoda, WI 53573

Resurfacing Project on Rural Ridge Road South of CTH Q
Infrastructure
Post-Bid
$62,000 CJ est. value
Cuba City, WI 53807

Salt Shed
New Construction, Infrastructure
Post-Bid
$400,000 CJ est. value
Cuba City, WI 53807

North Bypass and Second Street
Infrastructure
Results
Platteville, WI

West Entrance Exterior Concrete Repairs
Infrastructure
Results
$74,080 CJ est. value
Platteville, WI 53818

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Red Barn Wind Farm
Infrastructure
Construction
$162,000,000 CJ est. value
Wingville, WI 53569

Scenic Rivers Energy Cooperative Headquarters Building
New Construction, Infrastructure - 56,000 SF
Pending Verification
$7,000,000 CJ est. value
Lancaster, WI 53813

New Fire Station - City of Platteville
Demolition, New Construction, Infrastructure - 32,000 SF
Pending Verification
$16,000,000 CJ est. value
Platteville, WI 53818

Division Street Reconstruction - DPW3-2025 - City of Platteville
Infrastructure
Conception
$556,760 CJ est. value
Platteville, WI 53818

Last Updated 02/14/2024 08:18 AM
Project Title

Building Demolition and Site Restoration

Physical Address View project details and contacts
City, State (County) Cuba City, WI 53807   (Grant County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Single-Family Homes, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $674,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition and removal of a 64,000 sq. ft. building, foundation walls, utilities, and site improvements. Restoration of the site by removing existing asphalt, sidewalks, and curbs, leveling disturbed areas, installing salvaged topsoil, and fertilizing, seeding, and mulching the restored areas. Termination of utility services to the buildings at the exterior property lines. The City of Cuba City reserves the right to waive formalities in bidding and to reject any and all bids. The construction types vary throughout the buildings and there is an. approximately 7,300 sq. ft. basement located under a portion ofthe building. The Contractor shall remove, transport and properly dispose of all materials. Existing asphalt, sidewalks and curbs shall be removed and will be restored by placing 6" ofsalvaged topsoil over the areas. Contractor shall restore the entire site by leveling the areas disturbed, establishing a topsoil borrow area, installing 6" ofsalvaged topsoil material over the areas disturbed and over the borrow area. The top soiled areas shall be fertilized, seeded and mulched. Contractor shall terminate all utility services to the buildings at the exterior property lines and coordinate that work with the Utility Companies and the City ofCuba City. The Owner had an Abatement Report prepared to determine hazardous materials that will need to be disposed of by the Contractor. The completion date ofFebruary 16, 2024 has been established for the building demolition, removal, filling and leveling and May 31,2024 for topsoiling, fertilizing, seeding and mulching AH questions about the meaning err intent of the Bidding Documents are to be directed to ENGINEER in writing not less than 7 days prior to the date for opening of Bids.

Details

64,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents