Similar Projects
East Village Infrastructure
Post-Bid
$7,686,825 est. value
Charlotte, NC

Wake Forest Road/Blount Street/Person Street Phase I Improvements
Post-Bid
Raleigh, NC

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Optional Industry Forum and DBE Outreach Session
Results
Less than $2,200,000,000 est. value

Harris Teeter #345
Renovation - 58,652 SF
Construction
$3,509,985 est. value
Burlington, NC 27215

Ligon Mill Road Improvements
Post-Bid
Wake Forest, NC

Upgrading U.S. 70 to a Freeway
Results
NC

AST Paving and Resurfacing Project
Post-Bid
Raleigh, NC

Triangle Expressway Southeast Extension, NC 55 Bypass to East of Pierce Olive Road
Results
NC

Crossfield Taxiway - Package 1
Post-Bid
Greensboro, NC 27409

Asphalt Resurfacing
Results
Hillsborough, NC

International Drive Pavement Rehabilitation
Post-Bid
Less than $5,000,000 est. value
Morrisville, NC 27560

Widens I-95 to Eight Lanes and Reconstructs Interchanges from South of I-95 Business / US 301 (Exit 56) to North of SR 1002 (Long Branch Road - Exit 71) in Cumberland and Harnett Counties.
Results

Construction Manager for UNC Charlotte East Village Infrastructure
Post-Bid
Less than $6,000,000 est. value
Charlotte, NC

Wrightsville Beach Paving Project
Results
Wrightsville Beach, NC

Last Updated 10/01/2020 04:15 PM
Project Title

USDA Forest Service, NFsNC, Croatan RD, Craven County NC has a need for Road Maintenance IDIQ

Physical Address View project details and contacts
City, State (County) New Bern, NC 28560   (Craven County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,500 to $900,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

USDA Forest Service, NFsNC, Croatan RD, Craven County NC has a need for Road Maintenance IDIQ Contract, Base and 4 Option Periods. This work includes but it not limited to Blading Aggregate Surfaced Roads, Spot Surfacing Replacement with NCDOT ABC and/or Railroad Ballast, Clean and Reshape Ditches, Clean Culverts and Tail Ditches. Period of Performance: Base: April 1, 2020 - March 31, 2021 Option 1: April 1, 2021 - March 31, 2022 Option 2: April 1, 2022 - March 31, 2023 Option 3: April 1, 2023 - March 31, 2024 Option 4: April 1, 2024 - March 31, 2025

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents