Similar Projects
CSN West Charleston Building G Fume Hood Installation
Alteration
Bidding
$100,000 est. value
Las Vegas, NV 89146

SWRF Activated Carbon Media Replacement
Term Contract
Bidding
Henderson, NV 89074

J045--Chiller Comprehensive Service and Maintenance
Post-Bid

Fume Hood
Post-Bid
Las Vegas, NV

SWRF Untreated Air Pipe Replacement
Results
$1,225,000 est. value
Henderson, NV

West Charleston Building C - 2nd Floor HVAC Replacement Phase A
Results
$319,000 est. value
Las Vegas, North Las Vegas, NV 89146

Replace Ductwork In Dehumidifiers
Post-Bid
Las Vegas, Nelson, NV

West Flamingo Senior Center Pool Locker Room HVAC Upgrade
Results
$126,350 to $133,000 est. value
Las Vegas, NV

45--Supply and Replace HVAC Units
Post-Bid
Bullhead City, AZ - Boulder City, Echo Bay, NV 89005

UNLV CBC-C 1st and 2nd Floor Repipe
Results
$820,000 est. value
Las Vegas, NV 89154

HVAC Air Filter Replacement Service
Alteration
Post-Bid
NV

Big Bend Water Treatment Plant Ozone Generator Room HVAC Upgrade
Results
$182,681 est. value
Las Vegas, NV

99 Ces Replacement Boiler Building 777
Term Contract
Post-Bid
Nellis AFB, Nellis Air Force Base, NV 89191

Replace HVAC Components and Roof - Elizabeth Wilhelm Elementary
Results
$2,250,000 est. value
North Las Vegas, NV 89031

Central Plant Renovation, High Desert State Prison
Alteration
Post-Bid
$7,300,000 est. value
NV

Last Updated 09/28/2021 11:43 AM
Project Title

North Las Vegas Central Plant Phase 3

Physical Address View project details and contacts
City, State (County) North Las Vegas, NV 89030   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new cooling tower unit and related interface with existing central plant systems. Utility installation includes extension of existing and installation of new mechanical, plumbing and electrical utilities for the ground mounted unit and connection to the existing central plant. Utility installations are above grade and below grade. The work includes limited demolition and construction of new concrete footing for new cooling tower unit.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents