Similar Projects
Marquette University School of Business and Innovation
New Construction
Design
$60,000,000 est. value
Milwaukee, WI 53233

Renovation of Laboratory Space
Renovation
Bidding
La Crosse, WI 54603

Wyman Education Building Elevator Modernization
Renovation
Bidding
$230,000 est. value
River Falls, WI 54022

WCTC L Building Bridge Deck Repairs
Post-Bid
Pewaukee, WI 53072

Negative Pressure Environmental Enclosure(Uw-Mad)[21-0033]
Addition
Post-Bid
Madison, WI

Chemistry 2nd Floor Wang Lab Renovation
Renovation
Results
Less than $1,010,000 est. value
Madison, WI 53706

Agricultural Dean's Residence Remodel
Renovation
Results
Less than $335,000 est. value
Madison, WI 53706

Truax Campus Civil, Interior Design, Architecture Remodel
Renovation
Construction
Madison, WI 53704

MilliporeSigma
Renovation
Construction
Madison, WI 53711

Toilet & Shower Room GPC
Renovation
Bidding
$2,600,000 est. value
Oshkosh, WI 54901

CVTC Transportation Education Center Phase II
New Construction - 120,000 SF
Post-Bid
$29,800,000 est. value
Eau Claire, WI 54703

New CDIS Building A/E Qualifications
New Construction, Addition
Results
$150,000,000 est. value
Madison, WI 53715

Sewell Social Sciences 8th Floor - GPC
Renovation
Bidding
$700,000 est. value
Madison, WI 53706

Gateway Technical College KE Spring 2021 Remodel & Repair
Renovation
Post-Bid
Kenosha, WI 53144

Fox Valley Tech Student Life and Diversity - Oshkosh
New Construction
Results
Oshkosh, WI 54902

Last Updated 03/10/2022 01:17 PM
Project Title

Mitchell Hall Lab - GPC

Physical Address View project details and contacts
City, State (County) La Crosse, WI 54601   (La Crosse County)
Category(s) Education, Laboratory
Sub-Category(s) College/University, Laboratory
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,878,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of interior renovation of university athletic lab rooms and educational facilities in a single existing building. The total square footage of renovated areas is approximately 16,000 square feet at select areas of the building on three different floors. The work includes demolition of partition walls, finishes including flooring and ceilings, locker room equipment, concrete slabs on grade, plumbing, HVAC, electric and lighting. The work includes installation of steel stud gypsum assemblies, ceilings, flooring, and casework. The work includes installation of plumbing, mechanical systems, and electrical systems, including lighting, audio/video systems, and electronic security systems.

Details

College/University, Renovation, 1 Laboratory, 3 Stories Above Grade, 16,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Institutional Furniture, Laboratory Furniture.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents