Similar Projects
Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$42,000,000 CJ est. value
Austin, MN 55912

Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$42,000,000 CJ est. value
Austin, MN 55912

2022 Lift Station & Forcemain Improvements
Renovation, Infrastructure
Design
$1,643,613 CJ est. value
Grand Meadow, MN 55936

I-90 Bridge Replacements - Minnesota Department of Transportation
Demolition, New Construction, Infrastructure, Renovation
Design
$9,600,000 CJ est. value
Austin, MN 55912

Ramsey Dam Rehabilitation
Infrastructure
Post-Bid
$1,200,000 CJ est. value
Austin, MN 55912

Cured-In-Place-Pipe
Infrastructure
Post-Bid
Austin, MN 55912

2022 Street and Utility Improvements
Infrastructure
Results
$2,000,000 est. value
Grand Meadow, MN

21st Avenue North East Reconstruction
Infrastructure
Results
$500,000 est. value
Austin, MN 55912

Austin Public Library Remodel and Addition
Addition, Demolition, Build-out, Renovation, Infrastructure - 5,136 SF
Construction
$1,061,000 CJ est. value
Austin, MN 55912

1st & 3rd Apartments
New Construction, Infrastructure
Construction
$35,000,000 CJ est. value
Austin, MN 55912

10th Drive SE Intersection Improvements - City of Austin
Infrastructure
Conception
$1,000,000 CJ est. value
Austin, MN 55912

Bridge Removal and Box Culvert Construction Todd Park Trail Culvert
Infrastructure
Post-Bid
$430,000 CJ est. value
Austin, MN 55912

CRWD Earthen Dams
New Construction, Infrastructure
Results
$297,036 CJ est. value
Austin, MN 55912

10th Drive SE, Dobbins Creek Bridge #5229 - City of Austin
Addition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Austin, MN 55912

ALC Shop Addition
Addition, Demolition, New Construction, Infrastructure - 3,200 SF
Results
$1,119,000 CJ est. value
Austin, MN 55912

Last Updated 01/04/2024 07:38 AM
Project Title

I-90 Austin Bridges Improvement Project - Minnesota Department of Transportation

Physical Address View project details and contacts
City, State (County) Austin, MN 55912   (Mower County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $50,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 17 2023 this project is in working drawings complete. I-90 Austin Bridges Improvement Project INFRA Award: $25,000,000 Austin, Minnesota Applicant: Minnesota Department of Transportation Project Description: The project will reconstruct eight bridges (five overhead structures, two mainline bridges, and one pedestrian bridge) and rehabilitate two mainline bridges along I-90. The project includes ramp connection and traffic signal improvements associated with the bridges, construction of a network of ADA accessible multiuse sidewalks and trails, and replacement of stormwater infrastructure. Project Benefits: Currently I-90 is a barrier between downtown Austin and neighborhoods north of I-90. Extensive equity-focused community outreach and public engagement conducted for this project identified the need for improved bicycle and pedestrian facilities. Additionally, the project is aligned with the state’s climate action and equitable development plans and improves resiliency and disaster preparedness along the corridor. The interchange and traffic signal improvements also address the high number of left turn related crashes and queuing issues, improving safety and reducing congestion. From 2024 to 2026, MnDOT is planning to replace or repair bridges at six sites along the I-90 corridor in Austin. The work will include bridges at: Oakland Avenue West (Hwy 105), replace in 2024 14th Street Northwest (Hwy 218 north), replace in 2026 Fourth Street Northwest, replace in 2024-2025 I-90 over Cedar River, replace in 2024-2025 I-90 over Sixth Street Northeast, rehabilitate in 2024-2025 21st Street Northeast (Hwy 218 south), replace in 2026

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents