Similar Projects
I-80 Replace Bridge Struct's
Demolition, New Construction, Infrastructure
Conception
$16,390,905 CJ est. value
Howard, PA 16841

Hayes Run Bridge Box
Infrastructure
Conception
$743,748 CJ est. value
Potter Township, PA 16828

Bellefonte Waterfront Development - Mixed-Use Building - Phase 2
New Construction - 258,680 SF
Design
$10,000,000 CJ est. value
Bellefonte, PA 16823

Core Spaces Mixed Use Development
New Construction - 324,905 SF
Design
$35,000,000 to $40,000,000 est. value
State College, PA 16801

I-80 East Bound Lane from SR 3013 to SR 54
Infrastructure
Bidding
$50,000,000 CJ est. value
Clarence, PA 16823

SR 1002 Marsh Creek Bridge
Infrastructure, Renovation
Bidding
$3,056,366 CJ est. value
Howard, PA 16841

Parking Garage Maintenance
Infrastructure
Post-Bid
State College, PA

PSU Susan Welch Liberal Arts Building Enabling Work
New Construction - 140,600 SF
Post-Bid
$6,000,000 to $7,000,000 est. value
State College, PA

Green Hollow Park - Accessible Improvements Plan Phase 2 - Site Improvement
Infrastructure
Results
$70,000 est. value
State College, PA 16803

SCI Rockview Site Amenity/Infrastructure Improvement
Infrastructure
Results
$1,000,000 to $2,000,000 est. value
Bellefonte, PA 16823

Nittany Parking Deck Rehabilitation
Renovation
Construction
$1,716,400 est. value
State College, PA 16803

Academy Street Stormwater Project Rebid
Infrastructure
Construction
$69,879 CJ est. value
Boalsburg, PA 16827

Environmental Health and Safety (EH and S) Chemical and Radiation Waste Accumulation Facility
New Construction, Infrastructure - 11,000 SF
Pending Verification
$7,200,000 CJ est. value
State College, PA 16803

West College Avenue Mixed-Use Building
New Construction, Infrastructure - 15,516 SF
Pending Verification
$45,000,000 CJ est. value
State College, PA 16801

2025 Centre Bridge Preservation
Infrastructure, Renovation
Conception
$3,072,030 CJ est. value
State College, PA 16801

Last Updated 02/01/2023 02:03 AM
Project Title

SCI Benner - Bus/Maintenance Facility Upgrades

Physical Address View project details and contacts
City, State (County) Bellefonte, PA 16823   (Centre County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Parking Garage, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $11,621,997 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes, but is not limited to, construct a new five-bay bus/passenger vehicle garage with office, staff restroom, tool room, parts storage area and mechanical room. The building should include - vehicle lifts in all bays, heating and cooling system, vehicle exhaust systems, compressed air systems, vehicle wash area, oil/water separator, security cameras, and IT fit-outs/drops for 3 computer stations.1. Gene ral - $1,000,000 - $2,000,000 2. HVAC - $200,000 - $300,000 3. Plumbing - $300,000 - $400,000 4. Electrical - $100,000 - $200,000 CLIENT AGENCY REQUIREMENTS for prebid: No knives, guns, or weapons, of any kind are permitted on DOC Property. No Alcohol or tobacco permitted on site. Vehicles are subject to search while on DOC property. Cell phones maybe taken to the site after the meeting. The picture will be limited to ONLY the project site. The CFMM3 (David Smead) will have oversight of any pictures requested and may request to view any pictures taken. The meeting is one day therefore no clearance approvals are required. The site visit will be as a group and no stragglers will be accommodated. No masks or temperature screening are required at this time and within this location. The project site is located outside the secure perimeter fence. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities (BDISBO) identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. However, BDISBO did not set SDB and/or VBE participation goals for those procurements that are less than the $400,000 threshold required to set either goal. In addition, there will be no points allocated toward SDB/SB participation for this procurement. This is a significant programmatic change from the SDB and SB Participation program contained in prior Projects issued by Public Works. Bidders now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the Instructions to Bidders section regarding Small Diverse Business and Veteran Business Enterprise Participation for further information. The Goals for each Prime Contract is as follows: SDB AND VBE GOALS .1 General Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 10% VBE = 3% .2 HVAC Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 0% VBE = 0% .3 Plumbing Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 0% VBE = 0% .4 Electrical Construction - ALL BASE BIDS (#1, #2 & #3) SDB = 0% VBE = 0% Bid Results Phase 1.1 Base Bid Leonard S. Fiore, Inc. 2384000 Base Bid 2 Leonard S. Fiore, Inc. 2401000 Base Bid 3 Leonard S. Fiore, Inc. 2699000 Phase 1.2 Base Bid G. M. McCrossin, Inc. 557590 Base Bid 2 G. M. McCrossin, Inc. 837865 Base Bid 3 G. M. McCrossin, Inc. 874512 Phase 1.3 Base Bid K & K Plumbing Company 449200 Base Bid 2 K & K Plumbing Company 449200 Base Bid 3 K & K Plumbing Company 511874 Phase 1.4 Base Bid US Solutions, Inc 396000 Base Bid 2 US Solutions, Inc 29570 Base Bid 3 US Solutions, Inc 32186

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents