Similar Projects
PKAA, Todd Gulch Mine Closure Project #653E
Post-Bid
Denver, CO

Habitat For Humanity
Post-Bid
Denver, CO 80014

PKAA, Monte Cristo Project Osm #715N
Results
Less than $97,740 est. value
Denver, CO

Boat Ramps and Two Parts of the Trail Extension
Results
Denver, CO

Sheridan Station Mile High Development
New Construction - 138,566 SF
Construction
$10,000,000 est. value
Denver, CO 80214

LoDo Towers
New Construction, Renovation - 30,000 SF
Construction
$15,000,000 est. value
Denver, CO 80202

Filing 57 Utilities
Post-Bid
Denver, CO

Virginia Canyon Soda Project 721N
Results
Denver, CO

Block 176 Phase 1
New Construction, Demolition - 767,123 SF
Construction
Denver, CO 80202

FY20 CM Oliver and Sj Warren Remediation
Post-Bid
Denver, CO 80203

PKAA, FY2021, Moffat County Coal Refuse Project, 574E
Results
Denver, CO 80203

4600 South Kipling Townhomes
New Construction
Construction
Denver, CO 80127

High Point Filing No. 2 Lot 1 Mass Grading Project
Post-Bid
Denver, CO

PKAA, FY2021, Klondike Basin 2020 Mine Closure Project, 644E
Results
Less than $100,000 est. value
Denver, CO 80203

56th & Tower - Site Work
New Construction
Construction
$3,000,000 est. value
Denver, CO 80249

Reported 06/25/2020 12:00 AM
Project Title

PKAA, FY2021, Gold Park Project, 710N

Physical Address View project details and contacts
City, State (County) Denver, CO 80203   (Denver County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project work will include safeguarding one (1) shaft, one (1) decline, two (2) stopes, and five (5) adits. Closure methods include backfill, polyurethane foam plug, barbed wire fence, and steel grate. Bat exclusions will be installed prior to construction of closure on certain features. All backfilled features will use material located on site for fill. The use of a helicopter is required to deliver construction supplies such as steel, polyurethane foam, and fence material to the sites.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents