Similar Projects
Makers Quarter Masterplan
New Construction
Conception
San Diego, CA 92101

Sunrise Mall Macy's Redevelopment Phase 2
New Construction
Conception
Citrus Heights, CA 95610

Dana Point Surf Lodge
New Construction - 59,274 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dana Point, CA

Dana House Boutique Hotel
New Construction - 125,049 SF
Design
$10,000,000 CJ est. value
Dana Point, CA 92629

Fogo De Chao - Woodland Hills
New Construction - 9,178 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Los Angeles, CA 91367

Surfin` Chicken
Renovation - 2,055 SF
Bidding
Poway, CA 92064

Target #T0307 - Remodel
Renovation - 1,400 SF
Post-Bid
Cathedral City, CA 92234

Target #T0188 - Cafe Remodel
Renovation - 904 SF
Post-Bid
San Bernardino, CA 92408

Claremont Middle School New Multi Purpose Building and Kitchen
New Construction
Results
$13,000,000 est. value
Oakland, CA 94618

Intuit Dome (Los Angeles Clippers Arena)
New Construction - 1,071,000 SF
Construction
$1,800,000,000 est. value
Inglewood, CA 90304

Arena Califino
New Construction
Construction
$30,000,000 est. value
Oceanside, CA 92056

Oakland A's Stadium & Mixed-Use Development
New Construction - 550,000 SF
Pending Verification
$10,000,000 CJ est. value
Oakland, CA 94607

Cross Creek Ranch Mixed Use Development
New Construction
Pending Verification
$130,000,000 est. value
Malibu, CA 90265

Sunrise Mall Redevelopment Phase 3
New Construction
Conception
Citrus Heights, CA 95610

Brown Bear Lodge & Conference Center
New Construction - 131,800 SF
Design
$10,000,000 CJ est. value
Mariposa, CA 95338

Reported 06/13/2022 02:36 PM
Project Title

Tyler Winery (Tier II)

Physical Address View project details and contacts
City, State (County) Lompoc, CA 93436   (Santa Barbara County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and new construction of a mixed-use development in Lompoc, California. Working plans call for the construction of a 17,004-square-foot manufacturing facility. Construction of a 17,004-square-foot winery consisting of a 6,251-square-foot cold storage room; 8,784-square-foot lab, storage, restroom and processing tank room; 1,969-square-foot reception, tasting room, break room and offices; and a 4,863-square-foot accessory agricultural barn. As of May 27, 2022, this project is in final approvals. A general contractor has been selected. A timeline for construction has not been determined at this time.

Details

Food/Beverage Service, 17,004 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents