Similar Projects
Mill Pond Water Treatment Plant PFAS Treatment Upgrades Contract 2
New Construction
Bidding
$7,000,000 est. value
Burlington, MA 01803

Inspection and Repair of Sewer Pump Station
Renovation
Bidding
$125,000 est. value
Somerville, MA

2021 Sewer Pump Station On-Call Repair, Maintenance and Wet-Well Cleaning
Post-Bid
$131,595 est. value
Burlington, MA

On-Call Pump Station Services
Term Contract
Post-Bid
$60,000 est. value
Tewksbury, MA

Chemical Feed Stations - General Bids
Results
$2,575,000 est. value
North Reading, MA

Chemical Feed Stations - Filed Sub Bids
Results
$2,575,000 est. value
North Reading, MA

Improvements to and Rehabilitation of Existing Equipment and Structures at the WWTF - General Bid
Renovation
Bidding
$5,000,000 est. value
Acton, MA

Mill Pond Water Treatment Plant PFAS Treatment Upgrades Contract 2 - Filed Sub Bid
New Construction
Post-Bid
$7,000,000 est. value
Burlington, MA 01803

Pilcher Drive Pump Station Wastewater Grinder Installation
Results
Wilmington, MA 01887

Wimbledon Circle Wastewater Pump Station Upgrades
Renovation
Bidding
Waltham, MA

Francis Wyman Pump Station Rehabilitation and Force Main Replacement
Renovation, Infrastructure
Post-Bid
$2,700,000 est. value
Burlington, MA

Marlborough Standby Water Pump Station
New Construction
Results
$1,787,000 est. value
Marlborough, MA 01752

Improvements to and Rehabilitation of Existing Equipment and Structures at the WWTF - Sub Bid
Renovation
Post-Bid
$5,000,000 est. value
Acton, MA

Greensand Filtration Facility for Well No. 5 - General Bids
Results
$8,000,000 est. value
Holliston, MA 01746

Greensand Filtration Facility for Well No. 5 - Filed Sub Bids
Results
$8,000,000 est. value
Holliston, MA 01746

Reported 03/19/2022 12:00 AM
Project Title

Poplar Street Pump Station

Physical Address View project details and contacts
City, State (County) Somerville, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $100,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Stormwater pump station (50 MGD capacity), storage tank (4.0 MG capacity), community art center (5,000 SF) and public park including community garden. Site bound by 2 transportation projects: MBTA GLX and MassDOT McGrath Blvd. Development. Total project duration estimated at 40 months. The A/E firms of Stantec Consulting Services, Inc. and OverUnder are currently completing the Schematic Design phase of this project. Detailed Design is expected to last into 2022, with early bid packages becoming available in the Summer of 2022. It is anticipated that the CM will be under contract for Pre-Construction Services while the construction documents are being developed, with a possible construction start in the Fall of 2022. Construction is expected to be completed at the end of 2025. It is intended that the storage tank, box culvert, force main, and Pump Station, be fully functional and occupied by the Spring of 2025.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents