Similar Projects
Y1da--Add AHU Metering Louis Stokes VAMC
Design
$1,000,000 to $5,000,000 est. value
Cleveland, OH 44106

SWWTP Phase II East Primary Admin Lab HVAC Replacements
Alteration
Bidding
Cleveland, Columbus, OH 44125

East Professional Building Roof Top Unit and Garage Air Intake Replacement Project
Alteration
Bidding
Cleveland, OH 44103

The Federal Aviation Administration Logistic Center (FAALC) Requires Drainage Upgrade Around the Cleveland Air Traffic Control Tower Facility and the Replacement of Three Facility Chiller Pumps
Post-Bid
$25,000 to $100,000 est. value
Cleveland, OH 44114

HVAC and Mechanical Products
Term Contract
Post-Bid

Public Auditorium Music Hall Air Handling Units
Results
$950,000 est. value
Cleveland, OH 44114

Recreation Center - Lobby and Gym HVAC Modifications
Results
Less than $210,000 est. value
Cleveland, OH 44115

HVAC Cleveland Coast Guard
Post-Bid
Cleveland, OH 44114

Chiller Replacement at Cedar Extension High Rise
Results
Cleveland, OH 44104

HVAC Technical Services for Forced Air Furnaces
Term Contract
Post-Bid
Cleveland, OH

District Wide HVAC Building Automation System Upgrades (1589)
Results
$473,209 est. value
Cleveland, OH 44115

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Wolstein Cooling Tower Repair Phase 1
Results
Cleveland, OH 44115

Twinsburg Maintenance Facility HVAC and Miscellaneous Improvements
Alteration
Post-Bid
Cleveland, OH

HVAC Preventive Maintenance, HVAC Water Treatment Service, and Building Automation System Monitoring
Term Contract
Results
$150,336 est. value
Lakewood, OH 44107

Reported 01/12/2022 12:00 AM
Project Title

Fifty-One 51 Site Basic Preventative Maintenance Program

Physical Address View project details and contacts
City, State (County) Cleveland, OH 44106   (Cuyahoga County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Services: 1. Filter Changes (new media and labor for removal, disposal and installation). a) Air Handling Units (AHU/DOAS) Pre-Filters: 3 times per year per set. b) AHU/DOAS AFTER-Filters: 1 time per year per set. c) Air & Water Terminal Units: 1 time per year per terminal. d) Water Source Heat Pumps: 2 times per year per unit. e) Variable Refrigerant Flow (VRF) Terminal Units: Clean-Wash or Replace 2 times per year per unit. 2. Motor Belt Maintenance: 1 time per year per motor. 3. Motor Lubrication Maintenance: 1 time per year per motor. Scope of Work Included Equipment per School – to be cross-referenced by supplemental documents published AND field-verified at each site for accuracy: a. Reference Documents – see link above. b. Refer to MASTER Group Schedule of known HVAC Equipment installed, (to be field-verified): 1. Air Handling Units 2. Boilers 3. Chillers 4. Condensing Units 5. Dedicated Outside Air Systems 6. Dry & Fluid Coolers 7. Open Cooling Towers 8. Split DX AC Units 9. Variable Refrigerant Flow Systems 10. Exhaust Fans 11. Fan Coil Units 12. Water Source Heat Pumps 13. Unit Ventilators 14. Makeup Air Units 15. Hydronic Pumps 16. Glycol Makeup Units 17. Air Terminal Units 18. Heating Terminal Units.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents