Sewage Treatment Plant, Site Development Construction Project Lead, Bernice, LA 71222 (Union County)
Last Updated | 10/13/2023 05:34 PM |
Project Title | Fire Tower Water Treatment |
Physical Address | View project details and contacts |
City, State (County) | Bernice, LA 71222 (Union County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Results, Construction start expected October 2023 |
Bids Due | View project details and contacts |
Estimated Value | $196,000 [brand] Estimate |
Plans Available from | Owner |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In accordance with R.S. 38:2212(D), deposits on the first set of documents furnished to bona fide prime bidders will be fully refunded upon return of the documents; deposits on any additional sets will be refunded less the actual costs of reproduction. Refunds will be made upon return of the documents in good condition within ten days after receipt of bids. Each bid shall be accompanied by a cashier's check, certified check or acceptable Bid Bond payable to D'Arbonne Water System, Inc. in the amount not less than five percent (5%) of the total bid amount as a guarantee that, if awarded the Contract, the Bidder will promptly enter into a contract and execute such bonds as may be required. Each bid shall also be accompanied by a Corporate Resolution or written evidence of the authority of the person signing the bid for the public work as prescribed by LA R.S. 38:2212(B)(5). Electronic bids will not be allowed on this project. The successful bidder must submit executed copies of the Non-Collusion Declaration, Attestation Clause, and E-Verify Affidavit within ten (10) days of the bid opening. These items may be submitted with the bid. The successful Bidder shall be required to furnish a Performance Bond for the full amount of the Contract in accordance with Article 5 of the General Conditions. In addition, the successful Bidder shall be required to furnish a Labor and Material Payment Bond for the Contract in accordance with Article 5 of the General Conditions.Estimated Probable Construction Cost: $814,000 The Owner reserves the right to reject any or all bids |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |