Similar Projects
CPS Whistler NCP
Bidding
Chicago, IL 60643

CPS Douglass/Orr/Manley/Westinghouse Science Labs
Renovation
Bidding
Chicago, IL 60644

Lead Based Paint and Asbestos Risk Assessment
Term Contract
Post-Bid
Rock Island, IL 61201

Indefinite Delivery/ Indefinite Quantity (IDIQ) Enivronmental Multiple Award Contract (MAC) for Environmental Services and Remedial Actions Primarily Performed In The Navfac Midlant Great Lakes Area
Post-Bid
$50,000 to $250,000 est. value

Administration Office Improvements
Results
Long Grove, IL 60060

Reinberg ES Pre-K Annex
Results
$3,000,000 to $5,000,000 est. value
Chicago, IL 60634

Asbestos Abatement
Renovation
Bidding
Oak Forest, IL 60452

2021 School Renovations and Additions
Renovation, Addition
Post-Bid
Mount Prospect, IL 60056

Willowbrook High School Security Vestibule
Results
Villa Park, IL 60181

Kingsley Technology Server Room Relocation
Renovation
Bidding
Downers Grove, IL 60516

Interior and Exterior Repairs
Post-Bid
Granite City, IL

Pre-Demolition Asbestos Abatement
Results
Gurnee, Highland Park, Riverwoods, IL 60015

Asbestos Abatement at 2306-2308 and 2312 5th Avenue
Bidding
Moline, IL 61265

Lincoln Elementary School - Construction Dumpsters and Toilets
Post-Bid
Elmhurst, IL

Lead Service Line Replacement
Results
Oswego, IL 60543

Last Updated 03/18/2021 11:45 AM
Project Title

Interior Renovations And Asbestos Abatement

Physical Address View project details and contacts
City, State (County) Sandoval, IL   (Marion County)
Category(s) Education, Single Trades
Sub-Category(s) Elementary School, Environmental, Finishes/Interior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $145,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

BASE BID consists of the abatement of approximately 1,850 square feet of carpet covered asbestos containing floor tile and mastic, including carpet and associated mastic under full containment methods, the abatement of 140 square feet of double layer asbestos containing floor tile and mastic under full containment methods and the abatement of approximately 2,770 square feet of single layer asbestos containing floor tile and mastic by infrared heat removal methods. Removal of all associated wall base material is commensurate with the work. The work also contains interior renovations necessary for the creation of new administrative offices within an existing classroom, including demolition, new metal stud and gypsum board partitions, new vinyl tile and carpet tile flooring and rubber base (to replace a portion of removed asbestos containing flooring materials – the balance of new flooring will be provided and installed by others under separate contract), new suspended acoustical panel ceilings, new paint and new casework. Mechanical and electrical work is commensurate with the renovation. ALTERNATE BID #1 consists of the abatement of approximately 815 square feet of double layer asbestos containing floor tile and mastic under full containment methods. Removal of associated wall base material is commensurate with the work. The work also includes new vinyl tile flooring and rubber wall base materials (to replace a portion of the removed asbestos containing flooring materials - the balance of new flooring will be provided and installed by others under separate contract).

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Asbestos Remediation.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Miscellaneous Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Blanket Insulation, Firestopping, Joint Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Stainless-Steel Doors and Frames, Metal Frames, Stainless-Steel Frames, Wood Doors, Flush Wood Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Door Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Tiling, Ceilings, Acoustical Ceilings, Acoustical Panel Ceilings, Resilient Flooring, Carpeting, Tile Carpeting, Special Wall Surfacing, Stretched-Fabric Wall Systems, Painting and Coating, Painting.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents