Similar Projects
Joe Pool Lake Slide Repair
Design
$1,000,000 to $5,000,000 est. value
Dallas, TX 75249

Mckinney Municipal Complex
New Construction, Infrastructure - 173,000 SF
Sub-Bidding
$95,000,000 CJ est. value
McKinney, TX 75069

Phase 5 - Grading Package for Bridgewater
Post-Bid
TX

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Trinity Falls East Feed Waterline and Mclarry 36 inch Waterline
Results
McKinney, TX

Fishtrap Road Segment 4 Construction and Segment 1-4 Landscape Architecture
Results
$2,627,010 est. value
Prosper, TX 75078

Village 121 Site Work
New Construction
Construction
Plano, TX 75024

Popeyes / McKinney
New Construction, Infrastructure - 2,700 SF
Construction
$725,000 CJ est. value
McKinney, TX 75070

Spring Creek Parkway Mixed-Use Development / Plano
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Plano, TX 75074

Spring Creek Parkway Mixed-Use Development / Plano
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Plano, TX 75074

Phase 4A/4C - Bridgewater Paving Package
Post-Bid
TX

Erosion Control at Various Locations - Phase 3
Results
$4,694,826 est. value
Dallas, TX

K Avenue Lofts
New Construction, Infrastructure
Construction
$88,434,704 CJ est. value
Plano, TX 75074

Advanced Metering Infrastructure (AMI) System
Post-Bid
McKinney, TX

Pothole Repair
Results
$495,000 est. value
TX

Last Updated 08/25/2022 11:06 AM
Project Title

Fishtrap Road (Stuber Elementary to Dallas North Tollway) - 4 Lanes

Physical Address View project details and contacts
City, State (County) Prosper, TX 75078   (Collin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $26,811,507 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 8/25/2022 project was already awarded for $26,811,506.99. Construction will start within 10-days Questions and requests for clarifications emailed directly to Jay Carter, NIGP-CPP, CPPB, C.P.M., Purchasing Manager, at jcarter@prospertx.gov. The deadline for receipt of questions and requests for clarifications is 12:00 P.M. on Friday, July 8, 2022. After that day and time, no further questions or requests for clarifications will be accepted or answered by the Engineer or Town. Please complete and submit a Planholder Registration Form to be added to the official Planholder Listing. The Project consists of furnishing all labor, equipment and materials (except as otherwise specified), and performing all work necessary for the construction of 4 lanes of Fishtrap Road / First Street from Stuber Elementary to Dallas North Tollway including but not limited to excavation, embankment, moisture conditioning, subgrade / pavement, median landscape / irrigation, bridges / culverts, storm drainage, and water mains.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents