Similar Projects
Reverse Osmosis
Bidding
Nashua, NH 03060

Vehicle Exhaust Rail System (Supply & Install)
Bidding

J--Boiler Services VA Medical Centers New England
Post-Bid
Hartford, Newington, West Haven, CT - Bedford, Jamaica Plain, Leeds, MA - Manchester, NH - Providence, RI 06111

Cleaver Brooks Boiler Control Panel (Supply and Install)
Post-Bid
Concord, NH

J--Boiler Cleaning Services F&O
Results
Manchester, NH 03104

Water Heater Replacement
Results
Less than $25,000 est. value
Londonderry, NH 03053

Boiler Replacement Packers Falls Road Water Plant
Post-Bid
Newmarket, NH

Water Softener Replacement
Results
Brentwood, NH

Building Operations and Maintenance Services for Norris Cotton FB, Manchester, NH
Post-Bid
Manchester, NH

Lebanon Police Department Boiler Replacement- 36 Poverty Lane
Results
Lebanon, NH 03766

HVAC Repairs and Boiler Preventative Maintenance
Results
Concord, NH 03301

Temporary Boiler Removal at DOJ
Results
Less than $250,000 est. value
Concord, NH 03302

Furnace Replacement, Edward MacDowell Lake, Peterborough, NH
Results
Peterborough, NH

Garrison Elementary Boiler B-1 Replacement
Results
Dover, NH

SYSC Water Heater Replacements
Results
Less than $210,000 est. value
Manchester, NH 03101

Last Updated 01/22/2020 10:15 AM
Project Title

UNH - Utility Distribution

Physical Address View project details and contacts
City, State (County) Durham, NH 03824   (Strafford County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Piping replacements from Heating Vault HVT086 to Handler Hall, including construction of new “Pit 4”. Project will include new piping and associated controls and valves as specified on the plans and specifications, from existing pit 3 through the parking lot to a new installation of Pit 4, From there the Piping will continue into Handler Hall, where the distribution piping will be tied into the building systems. Some Mechanical work in the Mechanical room of Handler Hall will be included, as specified on the project drawings and in the project specifications. Project phasing to utilize existing steam and condensate lines to be utilized. New construction to be completed, thereby narrowing the utility shutdown window.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents