Similar Projects
Hollow Shaft High Service Pump Motor - 250HP
Infrastructure
Bidding
$25,000 est. value
Tampa, FL

Well Pump Diagnostic for Irrigation System NRCS FL
Post-Bid
Brooksville, FL 34601

Well Boring and Drilling
Post-Bid
Tampa, FL

Well and Pump Services (Installation and Repair)
Term Contract
Results
Less than $60,000 est. value
Tampa, FL 33601

Submersible Pump and Split Case Repair Services
Term Contract
Results
Bartow, FL 33831

J043--Supply: Water Tower Well Pump Replacement
Term Contract
Post-Bid
Tampa, FL 33612

Purchase and Installation of a New Pump, Motor, and Drive
Results
Hudson, FL 34669

Purchase and Installation of Well Pump and Motor
Alteration
Post-Bid
Plant City, FL 33563

Submersible Sewage Pumps and Accessories
Infrastructure
Results
Brooksville, FL

Tsurumi Pump - New and Replacement Pumps
Infrastructure
Post-Bid
Zephyrhills, FL

Pump and Well Replacement - San Antonio Complex
Alteration
Results
San Antonio, FL 33576

Berkley Road Water Treatment Plant - Well No. 3
Infrastructure
Post-Bid
Auburndale, FL 33823

Portable Diaphragm Mud Pumps
Infrastructure
Results
$41,969 est. value
Tampa, FL

Southwest Wellfield Project, Phase 1; West Polk Lower Floridan Aquifer Project Phase 1; Construction Manager At Risk, Polk Regional Water Cooperative
Infrastructure, Alteration
Post-Bid
$462,000,000 est. value
Winter Haven, FL

Raw Water Wells - 11, 84, and 89 Cleaning Project
Infrastructure
Results
$130,000 est. value
Dunedin, FL 34698

Last Updated 05/23/2022 08:49 AM
Project Title

As Needed Domestic Well Drilling Services

Physical Address View project details and contacts
City, State (County) (Hernando, Hillsborough, Pasco, Pinellas, Polk Counties)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To replace existing domestic wells located within mitigation areas of wellfields operated by Tampa Bay Water. The mitigation work to be performed under the Contract is pursuant to a work order issued by Tampa Bay Water. The work could be conducted in either Hernando, Hillsborough, Pasco, Pinellas or Polk Counties. The wells shall be equipped with appropriate pumps and discharge appurtenances as required and made ready for service

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents