Similar Projects
Verona Family Dental at Liberty Business Park
New Construction - 4,340 SF
Design
$2,500,000 est. value
Verona, WI 53593

Medical Examiner Imaging Lab Expansion
Addition, Demolition, Infrastructure
Bidding
$450,000 CJ est. value
McFarland, WI 53558

LifeStance Health / Madison
Renovation - 4,012 SF
Bidding
$970,000 CJ est. value
Madison, WI 53713

Shopko Optical
Build-Out - 2,416 SF
Post-Bid
Waunakee, WI 53597

Azura Vascular Care
Renovation - 8,422 SF
Post-Bid
Madison, WI 53718

Building 6 Remodel - GPC
Renovation, Infrastructure
Results
$14,833,000 CJ est. value
Madison, WI 53704

Westgate Mall Redevelopment
New Construction - 416,064 SF
Construction
$10,000,000 CJ est. value
Madison, WI

Usona Institute on Promega Campus
New Construction - 93,000 SF
Construction
Fitchburg, WI 53711

Verona Family Dental
New Construction, Infrastructure - 4,353 SF
Pending Verification
$2,500,000 CJ est. value
Verona, WI 53593

VA Health Clinic
New Construction, Infrastructure - 30,000 SF
Pending Verification
$17,500,000 CJ est. value
Madison, WI 53718

UW Health Imaging
Renovation
Post-Bid
Madison, WI 53792

Milan Laser Hair Removal / Madison
Renovation - 1,564 SF
Construction
$200,000 CJ est. value
Madison, WI 53705

UW Health - West Clinic Remodel
Renovation
Post-Bid
Madison, WI 53717

UW Health K4-2 Oncology Clinic - Madison
Renovation
Post-Bid
$1,000,000 est. value
Madison, WI 53792

UW Health Atrium Elevators - Madison
Renovation
Post-Bid
Madison, WI 53792

Last Updated 03/13/2023 05:04 PM
Project Title

UW Hospital And Clinics - F Wing - Electric Elevator Alterations

Physical Address View project details and contacts
City, State (County) Madison, WI 53792   (Dane County)
Category(s) Medical
Sub-Category(s) Medical Office/Outpatient
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Section is intended to cover the modernization of three (3) existing Dover geared electric passenger elevators located at in the F Wing at UW Hospital, 600 Highland Ave, Madison, WI. The scope of work includes new gearless traction machines, operation and motion controls, door operator equipment, signal fixtures, and car enclosure renovations. This Section indicates the extent of the elevator renovations. Work shall include all work and material specified for a complete and first-class installation in every respect, and once started is to proceed without interruption during regular working hours until complete. Where a device or part of the equipment is referred to in the singular number, it is intended that such reference shall apply to all devices for all elevators, unless otherwise indicated. Unless specifically identified as "Retain" or "Reuse" in Part 2, provide new equipment. Equipment that is "Retained" or "Reused" shall be reconditioned or renewed to place into satisfactory condition for reuse. Any components not specifically replaced (retained components) shall be cleaned, adjusted, lubricated, refurbished, recalibrated, painted, fasteners tightened, tested, and warrantied. Where "Bidder" or "Contractor" is identified, it shall refer to the Contractor and/or their subcontractors. Where Contractor is directed to "Provide" devices or equipment, such devices or equipment shall be furnished and installed as work under this project. Contractor shall provide all labor, elevator equipment, material, transportation, tools and equipment, temporary protection, lubricants and cleaning supplies, employee safety equipment, supervision, coordination, and other work or items required to perform work under this Section, whether or not expressly stated. Contractor shall be solely responsible for complete compliance with contract documents, omissions, environmental regulations other than asbestos or lead paint, for verifying all dimensions, existing conditions, calculations, and voltages found in this Specification or on the drawings, which are provided for the convenience of bidders, for fabrication, and for coordination of work of other trades. It is stipulated that the drawings are representations of the existing equipment. See Part 2 for changes. Failure to visit site or failure to examine any and all documents will in no way relieve successful Bidder from the necessity of furnishing any materials or equipment, or performing any work that may be required. Neglect of above requirements will not be grounds for delay in work or additional compensation. All applicable permit and inspection fees and licenses are to be included by Contractor in their bid price.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Furnishings and Accessories, Seating.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents