Similar Projects
Last Updated | 03/13/2023 05:04 PM |
Project Title | UW Hospital And Clinics - F Wing - Electric Elevator Alterations |
Physical Address | View project details and contacts |
City, State (County) | Madison, WI 53792 (Dane County) |
Category(s) | Medical |
Sub-Category(s) | Medical Office/Outpatient |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected May 2022 |
Bids Due | View project details and contacts |
Estimated Value | $500,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This Section is intended to cover the modernization of three (3) existing Dover geared electric passenger elevators located at in the F Wing at UW Hospital, 600 Highland Ave, Madison, WI. The scope of work includes new gearless traction machines, operation and motion controls, door operator equipment, signal fixtures, and car enclosure renovations. This Section indicates the extent of the elevator renovations. Work shall include all work and material specified for a complete and first-class installation in every respect, and once started is to proceed without interruption during regular working hours until complete. Where a device or part of the equipment is referred to in the singular number, it is intended that such reference shall apply to all devices for all elevators, unless otherwise indicated. Unless specifically identified as "Retain" or "Reuse" in Part 2, provide new equipment. Equipment that is "Retained" or "Reused" shall be reconditioned or renewed to place into satisfactory condition for reuse. Any components not specifically replaced (retained components) shall be cleaned, adjusted, lubricated, refurbished, recalibrated, painted, fasteners tightened, tested, and warrantied. Where "Bidder" or "Contractor" is identified, it shall refer to the Contractor and/or their subcontractors. Where Contractor is directed to "Provide" devices or equipment, such devices or equipment shall be furnished and installed as work under this project. Contractor shall provide all labor, elevator equipment, material, transportation, tools and equipment, temporary protection, lubricants and cleaning supplies, employee safety equipment, supervision, coordination, and other work or items required to perform work under this Section, whether or not expressly stated. Contractor shall be solely responsible for complete compliance with contract documents, omissions, environmental regulations other than asbestos or lead paint, for verifying all dimensions, existing conditions, calculations, and voltages found in this Specification or on the drawings, which are provided for the convenience of bidders, for fabrication, and for coordination of work of other trades. It is stipulated that the drawings are representations of the existing equipment. See Part 2 for changes. Failure to visit site or failure to examine any and all documents will in no way relieve successful Bidder from the necessity of furnishing any materials or equipment, or performing any work that may be required. Neglect of above requirements will not be grounds for delay in work or additional compensation. All applicable permit and inspection fees and licenses are to be included by Contractor in their bid price. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |