Similar Projects
Sump Pumps Control Panel
Renovation
Sub-Bidding
$80,000 CJ est. value
Brighton, MI 48116

Building Envelope Repair
Post-Bid
Ypsilanti, MI 48197

Exterior Vinyl Siding and Trim - Township Hall
Post-Bid
Millersburg, MI 49759

Exterior Column Repairs At Scarlett Ms
Results
Ann Arbor, MI

Algonquin & Latonia Apartments - Exterior Deck Improvements
Results
Detroit, MI 48208

Linwood Elementary Wall Infill Project
Post-Bid
Linwood, MI 48634

Exterior Rehabilitation for Middleville Train Depot
Results
Middleville, MI

Public Art Installation at Marketplace on the Green
Post-Bid
Okemos, MI 48864

DPW Lean-to Repairs
Results
Taylor, MI

Exterior Stair Improvements at Huron and Eberwhite
Alteration
Post-Bid
Ann Arbor, MI 48105

Boardman River Deck and Staircase Railing
Alteration
Results
Traverse City, MI

Wall Project Engineering Division
Alteration
Post-Bid
Warren, MI

Grand Tower - Exterior Waterproofing
Alteration
Results
Lansing, MI 48933

Recreation Center Entry Construction
Alteration
Post-Bid
Detroit, MI

Aluminum Sloped Atrium System Caulking Repair
Alteration
Results
Rochester, MI 48307

Last Updated 10/06/2022 02:07 PM
Project Title

Lead Service Verification (Potholing)

Physical Address View project details and contacts
City, State (County) Bronson, MI 49028   (Branch County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: Utility potholing via vacuum extraction at 173 properties for purposes of determining material types on the house and street sides of the existing curb stops for a random sampling of water service throughout the City of Bronson. Including all necessary appurtenances and restoration. A bid bond, certified check, or cashier's check payable to City of Bronson in an amount equal to five percent (5%) of the total price shall accompany each bid. This surety shall bind the bidder for a period of Sixty (60) days after the receipt of bids.The project shall be completed by October 1, 2022. The work to be performed under this contract will be financed and paid for by funds received from EGLE and their Drinking Water Asset Management Grant.

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents