Similar Projects
Missouri Creek Drainage Improvements
Infrastructure
Bidding
Fayetteville, AR

Little Rock Afb Civil Works
Term Contract
Bidding
$79,000,000 est. value
Jacksonville, AR 72078

Corrugated Steel Pipe and Bands
Post-Bid
Hamburg, AR

Drainage Improvements
Infrastructure
Post-Bid
Ward, AR

Hwy. 154 Slide Repair (Conway CO)
Results
AR

Deans Trail Phase 2
Results
$2,300,000 to $2,400,000 est. value
Springdale, AR

Street and Drainage - Kanis Road
Infrastructure
Bidding
Little Rock, AR

Reclamation of Brotherton Highwall
Infrastructure
Post-Bid
Branch, AR

Zoo Drainage Improvements Project
Infrastructure
Results
Little Rock, AR 72205

Construction of a County Road Crossing an Irrigation Canal and the Installation of a Quintuple 10'X10' Box Culvert
Infrastructure
Bidding
Mabelvale, AR

Drainage Improvements at The Searcy Municipal Airport
Infrastructure
Post-Bid
Searcy, AR 72143

Benton Utilities - Chenault North Reservoir Levee Repair
Infrastructure
Results
Benton, AR

Concrete Drainage Pipe
Infrastructure
Bidding
Fayetteville, AR

Adams Field and Fourche Creek Remediation
Infrastructure
Post-Bid
Little Rock, AR

Reclamation of AML Montreal Gob Pile
Infrastructure
Results
Huntington, AR 72940

Last Updated 10/07/2021 08:16 AM
Project Title

LRPA Fourche Island DD No. 2 Levee Relocation

Physical Address View project details and contacts
City, State (County) Little Rock, AR   (Pulaski County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,200,000 to $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but is not limited to, 5,600 cubic yards of unclassified excavation, 14,000 cubic yards of embankment construction, 8,600 cubic yards of select engineered fill, 50 cubic yards of flowable fill, 210 cubic yards of seal concrete, 220 linear feet of concrete pipe culverts, 240 linear feet of wire fencing, 2 stoplog structures, 35 linear feet of track reconstruction, and 1 No. 8 turnout reconstruction

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents