Similar Projects
FLD H SW Chiller Plant - Add Chiller - Phase 9
Renovation
Sub-Bidding
$1,275,000 CJ est. value
Salt Lake City, UT 84112

Replace Chillers
Term Contract
Post-Bid
Salt Lake City, UT 84116

SD 100/160 HVAC Overhaul Kits
Alteration
Post-Bid
Salt Lake City, UT

Chiller Replacement Jefferson Jr. High School
Results
Kearns, UT 84118

Health Science Campus High Temp Water Line Removal
Results
$1,140,000 est. value
Salt Lake City, UT 84112

Canterbury Furnaces
Alteration
Post-Bid
Salt Lake City, UT

J041--660 - (S4) ** EMERGENT** Air Handler Repair Bldg 2 AHU Repairs
Term Contract
Results
Salt Lake City, UT 84148

Salt Lake City ATCT CRAC Unit Upgrades
Term Contract
Post-Bid
Salt Lake City, UT

Westpointe Student Support Building Roof and Rooftop Mechanical Replacement
Alteration
Results
$950,000 est. value
Salt Lake City, UT 84116

HVAC Generation 4/5 LG VRF System Service/Maintenance
Alteration
Post-Bid
Salt Lake City, UT

Air Terminal Upgrade
Alteration
Results
UT

Airport Operations Center HVAC
Alteration
Post-Bid
Salt Lake City, UT 84122

Jewelry Room Ventilation
Term Contract
Results
Herriman, UT 84096

University Of Utah Generator And Switches
Term Contract
Post-Bid
Salt Lake City, UT 84112

HTW: Replace Expansion Tanks And Add Dearator
Term Contract
Results
$4,445,362 est. value
Salt Lake City, UT 84129

Last Updated 11/02/2022 06:31 PM
Project Title

Hunter Elementary School - HVAC Controls Upgrade

Physical Address View project details and contacts
City, State (County) West Valley City, UT 84120   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,890,971 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Hunter Elementary School - HVAC Controls Upgrade IN GENERAL. The DESIGNER’S Basic Services consist of those described in this Agreement, the Supplemental General Conditions, General Conditions, and Design Standards, and include normal structural, mechanical, electrical, and architectural as well as other consulting services reasonably necessary to fulfill the DESIGNER’S duties under this Agreement. Any additional scope of service requirements are provided in Attachment "A" and the Design Standards. 1. Incidental Services/Reimbursements. DESIGNER shall provide all services incidental to the DESIGNER’S identified Basic Services as established by standard professional custom and practice. The Consultant reimbursements for this project have been estimated as a NOT-TO-EXCEED part of the fee and are allowed on (with no mark-up) as follows: a) Miscellaneous: e.g. express mail, photos, long distance calls. An original invoice must be submitted for each item. Exceptions to the above shall be approved by GSD in writing. 2. Direction from GSD Representative Only. DESIGNER has neither the responsibility nor the authority to accept directives or determinations from any person other than the GSD Representative. The DESIGNER shall not take any direction from Contractor or any other third party’s representative. 3. Review Requests for Information. The DESIGNER shall review properly prepared and timely Requests for Information by the Contractor.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents