Similar Projects
Highway 72 Widening
Infrastructure
Bidding
$365,000 est. value
Arvada, CO 80007

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Prairie Song Metropolitan District Filing 1 Development and Offsite Utilities Projects
Infrastructure
Post-Bid
Lakewood, CO 80227

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Ralston Road - Yukon Street to Garrison Street
Results
Arvada, CO 80001

Public Works Road Rejuvenation
Infrastructure
Post-Bid
Edgewater, CO

Traffic Signal Replacement
Results
$1,000,000 to $5,000,000 est. value

Asphalt Paving
Infrastructure
Post-Bid
Edgewater, CO

Removing 2.5 of Existing Asphalt Pavement
Results
$1,000,000 to $5,000,000 est. value
CO

Storm Sewer and Street Improvements (West 20th Avenue - Urban Drive To Union Street)
Infrastructure
Post-Bid
CO 80227

Resurfacing
Results
$5,000,000 to $20,000,000 est. value
CO

2022 Slurry Project
Infrastructure
Post-Bid
$328,000 to $40,500 est. value
Wheat Ridge, CO

Bear Creek to Homestead Golf Course Trail Reconstruction
Results
Less than $100,000 est. value
Lakewood, CO

2022 Asphalt Overlay Project
Term Contract
Post-Bid
Wheat Ridge, CO

On Call Region 1 Asphal Paving Services
Results

Last Updated 06/30/2022 11:34 AM
Project Title

Rocky Mountain Metropolitan Airport Taxiway Reconstruction - Jefferson County

Physical Address View project details and contacts
City, State (County) Broomfield, CO 80021   (Jefferson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $3,053,510
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope of work has not been determined. Conceptual plans call for site work for a transportation facility; and for paving for a transportation facility. As of June 29, 2022, this project is in the conceptual phase. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to January 2023.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents