Similar Projects
Yorkshire Subdivision
New Construction, Infrastructure
Conception
$6,260,000 CJ est. value
Reno, NV 89501

City Hall - Southeast ADA Ramp Improvements - Construction - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

Corwin Ford Dealership
New Construction
Design
Reno, NV 89508

Carlotz
New Construction
Design
Reno, NV 89511

CF21 Concrete and Pavement Replacement at Stead Manor
Infrastructure
Bidding
$563,776 CJ est. value
Reno, NV 89506

SR445, Washoe County
Infrastructure
Bidding
$49,000,000 CJ est. value
Sparks, NV 89436

Moana Springs Community Aquatics & Fitness Center - GMP2
New Construction, Infrastructure
Sub-Bidding
$26,500,000 CJ est. value
Reno, NV 89501

Development of Airport Site for Air Cargo Facilities
Infrastructure
Post-Bid
Reno, NV 89502

University of Nevada Reno - Mathewson University Gateway Development Phase I
New Construction, Infrastructure - 125,000 SF
Post-Bid
$2,000,000 CJ est. value
Reno, NV 89557

5th, 6th, 7th, and G Street Main Replacement
Infrastructure
Results
$831,662 CJ est. value
Reno, NV 89501

Construct Facilities for Softball Program at Hixson Park, Phase 1
New Construction, Infrastructure
Results
$1,515,515 CJ est. value
Reno, NV 89512

Bill Pearce Motors Porsche
New Construction
Construction
$3,483,213 est. value
Reno, NV 89511

United Nissan of Reno
New Construction
Pending Verification
Reno, NV 89502

Planet Auto Self-Serv
New Construction
Pending Verification
Reno, NV 89512

Maintenance Garage - West Side Parking Lot Rehabilitation - City of Sparks
Infrastructure
Conception
$250,000 CJ est. value
Sparks, NV 89431

Last Updated 11/03/2022 01:05 PM
Project Title

United Nissan of Reno

Physical Address View project details and contacts
City, State (County) Reno, NV 89502   (Washoe County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $14,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 51,840-square-foot auto dealership. As of November 3, 2022, a demolition permit has been approved, but has not been issued. There are no permits on file for new construction at this time. Information regarding the method of general contractor selection has not been disclosed. A construction schedule is unavailable. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

51,840 SF.
Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents