Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

AutoZone #3658 / Oak Hills
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Oak Hills, CA 92344

Los Serranos Safe Routes to Schools East - ST210005- City of Chino Hills
Infrastructure
Design
$1,218,600 CJ est. value
Chino Hills, CA 91709

Starbucks / San Bernardino
New Construction, Infrastructure - 1,001 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Laurel Avenue at Randall Avenue
Alteration
Post-Bid
Fontana, CA 92331

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Z1da--Service-Renovate Domestic Water Piping Projects FMS
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Loma Linda, CA

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Pending Verification
$275,000,000 CJ est. value
Redlands, CA 92373

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Sewer Rehabilitation FY2024 - 25 - Grand Avenue - Pipeline to Roswell, Roswell Avenue - Grand Avenue To Schaefer - City of Chino
Infrastructure
Conception
$1,543,125 est. value
Chino, CA

La Quinta Inn & Suites / Colton
New Construction, Infrastructure - 42,331 SF
Design
$12,500,000 CJ est. value
Colton, CA 92324

Last Updated 09/20/2022 08:08 AM
Project Title

Cadiz Water Conveyance Project

Physical Address View project details and contacts
City, State (County) Twentynine Palms, CA 92277   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected March 2019
Bids Due View project details and contacts
Estimated Value $250,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of a phased water supply project to actively manage the groundwater basin underlying a portion of the Cadiz and Fenner Valleys in the Mojave Desert, conserve renewable native groundwater otherwise lost to evaporation, and create a new reliable water supply for Southern California. Phase 1 will capture approximately 50,000 acres of groundwater per year from a wellfield on the owner's property and deliver it via a pipeline to the Colorado River Aqueduct. Phase 2 will use the available capacity in the soils beneath the ground to store up to 1 million acres of imported water. As of October 1, 2018 the project is in planning stage. On August 31, 2018 state legislation to stop the project was defeated. Phase 1 is approximately 95% permitted and engineering is complete. Phase 2 will undergo a separate environmental review and permitting process after the first phase is implemented. Information regarding the design team, general contractor and a method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the first quarter of 2019.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents