Similar Projects
500 North - 700 East to 900 East - City of Provo
Infrastructure
Conception
Provo, UT 84601

500 West - 1560 South to 920 South
Alteration
Conception
$1,800,000 est. value
Provo, UT 84601

Eagle Mountain Medical Office Building
New Construction, Infrastructure - 11,434 SF
Design
$7,000,000 CJ est. value
Eagle Mountain, UT 84005

2022 Santaquin Center Street Storm Drain Improvements Project
Infrastructure
Design
$883,409 CJ est. value
Santaquin, UT 84655

A to Z Building Blocks Day Care Expansion
Addition, Demolition, Infrastructure - 6,738 SF
Sub-Bidding
$1,600,000 CJ est. value
Eagle Mountain, UT 84005

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Engineering Building Utah Valley University
New Construction, Infrastructure
Post-Bid
$88,148,000 CJ est. value
Orem, UT 84058

CM/GC for Cold Springs Transmission Pipeline Rehabilitation 2021
Infrastructure
Results
Spanish Fork, UT

Vineyard City Phase 1 Water Distribution Pipeline
Infrastructure
Results
Vineyard, UT

The Crossing
New Construction
Construction
Saratoga Springs, UT 84045

Active Auto / Spanish Fork
New Construction, Infrastructure - 12,350 SF
Construction
$3,300,000 CJ est. value
Spanish Fork, UT 84660

East Center Street Townhomes
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Spanish Fork, UT 84660

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

24" Transmission Line 1730 North - 1500 West to 1680 North Geneva - City of Provo
Infrastructure
Conception
$8,000,000 est. value
Provo, UT 84603

Harvey Well Deepening Project
Infrastructure
Design
$170,000 CJ est. value
Cedar Hills, UT 84062

Last Updated 04/16/2023 07:01 AM
Project Title

CDBG Phase 10 - Waterline and Infrastructure Improvement Project

Physical Address View project details and contacts
City, State (County) American Fork, UT 84003   (Utah County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $698,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of roadway improvements on 300 W including approximately 3400 SY of full depth reclamation, and approximately 800 LF of 10" C900 water line and fire hydrant installation. Improvements also include sidewalk, curb and gutter, ADA ramps and drive approaches, as well as improvements to existing storm drain facilities. All work must be substantially completed by November 30th, 2022. See contract documents for owner furnished materials. All questions will be accepted up until Tuesday, March 28, 2023 at 1:00 p.m.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents