Similar Projects
Last Updated | 02/20/2020 07:09 AM |
Project Title | Roadway Reconstruction and Related Work (Including Signals) along a Section of Melnea Cass Boulevard |
Physical Address | View project details and contacts |
City, State (County) | Boston, MA (Suffolk County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $19,001,312 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | "1.000","Ls","Schedule Of Operations - Fixed Price $100000","100." "264.000","Hr","Tree Trimming - Existing Trees","102.121" "264.000","Hr","Tree Canopy Cleaning And Trimming","102.13" "318.000","Ea","Soil Injection Fertilizer","102.21" "215.000","Ea","Tree Protection - Armoring & Pruning","102.511" "968.000","Ft","Air Excavation & Root Pruning (Airspading)","102.513" "2580.000","Ft","Tree And Plant Protection Fence-Chain Link","102.5211" "1980.000","Ft","Tree And Plant Protection Fence- Poly Snow","102.5221" "480.000","Hr","Arborist","102.55" "123.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "2.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "2.000","Ea","Stump Removed","105." "1.000","Ls","Site Sanitation For Pest Control","119.01" "28500.000","Cy","Earth Excavation","120." "5.000","Cy","Class a Rock Excavation","121." "35.000","Cy","Class a Trench Excavation","141." "150.000","Cy","Test Pit For Exploration","141.1" "50000.000","Ft","Subsurface Utility Exploration","141.11" "80.000","Cy","Class b Trench Excavation","142." "20.000","Cy","Class b Rock Excavation","144." "19.000","Ea","Drainage Structure Abandoned","145." "14.000","Ea","Drainage Structure Removed","146." "1.000","Ls","Public Outreach","149.2" "100.000","Cy","Ordinary Borrow","150." "100.000","Cy","Special Borrow","150.1" "9800.000","Cy","Gravel Borrow","151." "247.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "1400.000","Ton","Crushed Stone","156." "1760.000","Ton","#67 Crushed Stone Choker Base Course","156.01" "300.000","Ton","#57 Crushed Stone Reservoir Sub-Base Course","156.02" "38800.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Environmental Health And Safety Program","180.01" "40.000","Hr","Personal Protection Level c Upgrade","180.02" "40.000","Hr","Licensed Site Professional Services","180.03" "900.000","Ton","Disposal Of Unregulated Soil","181.11" "10.000","Ton","Disposal Of Regulated Soil - In-State Facility","181.12" "10.000","Ton","Disposal Of Regulated Soil - Out-Of-State Facility","181.13" "10.000","Ton","Disposal Of Hazardous Waste","181.14" "80.000","Ton","Disposal Of Treated Wood Products","184.1" "5.000","Ea","Catch Basin Type 13 Modification","201.13" "49.000","Ea","Catch Basin - Municipal Standard","201.5" "19.000","Ea","Manhole Base","202.011" "112.000","Ft","Manhole Walls","202.012" "4.000","Ea","Drywell","205.11" "111.000","Ea","Precast Leaching Galley","205.12" "8.000","Ea","Drop Inlet","209.11" "89.000","Ea","Drainage Structure Adjusted","220." "50.000","Ft","Drainage Structure Rebuilt","220.2" "16.000","Ea","Drainage Structure Change In Type","220.3" "11.000","Ea","Drainage Structure Remodeled","220.5" "20.000","Ft","Sanitary Structure Rebuilt","220.6" "21.000","Ea","Sanitary Structure Adjusted","220.7" "2.000","Ea","Sanitary Structure Remodeled","220.8" "1.000","Ea","Diamond Plated Access Hatch","221.2" "84.000","Ea","Frame And Grate (Or Cover) Municipal Standard","222.3" "1.000","Ea","Frame And Grate Type Ii","223.31" "74.000","Cy","Removal Of Drainage Structure Sediment","227.3" "1050.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "799.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "888.000","Ft","12 Inch Reinforced Concrete Pipe Minor Drain","241.121" "75.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "1510.000","Ft","6 Inch Slot-Perforated Corrugated Plastic Pipe (Subdrain)","269.06" "189.000","Ft","Lay 6 Inch Ductile Iron Water Pipe","302.061" "471.000","Ft","Lay 12 Inch Ductile Iron Pipe","302.121" "2160.000","Lb","Ductile Iron Fittings For Water Pipe","309." "2.000","Ea","6 Inch Gate And Gate Box","350.06" "80.000","Ea","Gate Box Adjusted","358." "3.000","Ea","12 x 6 Inch Tapping Sleeve, Valve And Box","370.4" "13.000","Ea","Hydrant - Removed And Reset","376.2" "3.000","Ea","Service Box","381." "2230.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "26700.000","Sy","Pavement Fine Milling","415.2" "1320.000","Sy","High Early Strength Cement Concrete Base Course","431." "56130.000","Lb","Calcium Chloride For Roadway Dust Control","440." "17.000","Mgl","Water For Roadway Dust Control","443." "360.000","Ton","Wma Porous Pavement Surface Course","450.14" "360.000","Ton","Wma Porous Pavement Intermediate Course","450.15" "450.000","Ton","Superpave Surface Course – 9.5 (Ssc – 9.5)","450.22" "4790.000","Ton","Superpave Surface Course - 12.5 Polymer (Ssc - 12.5 - p)","450.231" "740.000","Ton","Superpave Intermediate Course - 12.5 (Sic -12.5)","450.31" "5990.000","Ton","Superpave Intermediate Course - 19.0 Polymer (Sic - 19.0 - p)","450.321" "4990.000","Ton","Superpave Base Course - 37.5 (Sbc - 37.5)","450.42" "270.000","Ton","Hma For Patching","451." "3800.000","Gal","Asphalt Emulsion For Tack Coat","452." "22900.000","Ft","Hma Joint Sealant","453." "2060.000","Ton","Asphalt Mixtures For Temporary Work","472." "220.000","Sy","Cement Concrete Pavement","476." "50.000","Ft","Milled Rumble Strip","477." "14300.000","Ft","Granite Curb Type Va4 - Straight","504." "2010.000","Ft","Granite Curb Type Va4 - Curved","504.1" "440.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "64.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "56.000","Ea","Granite Curb Inlet - Straight","514." "275.000","Ea","Granite Curb Corner Type a","516." "9.000","Ea","Granite Curb Corner Type b","517." "6000.000","Ft","Curb Removed And Reset","580." "1.000","Ea","Curb Inlet Removed And Reset","581." "6870.000","Ft","Curb Removed And Discarded","594." "1980.000","Ft","Highway Guard Removed And Discarded","630.2" "1150.000","Ft","48 Inch Chain Link Fence (Spring Tension Wire) (Line Post Option)","644.048" "730.000","Ft","72 Inch Chain Link Fence (Spring Tension Wire) (Line Post Option)","644.072" "210.000","Ft","96 Inch Chain Link Fence (Spring Tension Wire) Vinyl Coated (Line Post Option)","644.196" "750.000","Ft","3 1/2 Foot Steel Picket Fence","655.25" "500.000","Ft","Bus Stop Railing","660.1" "100.000","Ft","Stone Masonary Wall Removed And Rebuilt In Cement Mortar","690.01" "140.000","Ea","Silt Sack","697.1" "5120.000","Sy","Geotextile Fabric For Separation","698.3" "11900.000","Sy","Cement Concrete Sidewalk","701." "10150.000","Sf","Stamped Cement Concrete","701.01" "360.000","Sy","Cement Concrete Sidewalk At Driveways","701.1" "5000.000","Sf","Concrete Paver On Concrete Base","701.104" "800.000","Sf","Brick Unit Paver On Concrete Base","701.105" "1310.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "366.000","Sy","Granular Stabilized Pavement","704.01" "615.000","Sy","Brick Walk Removed And Relaid","706.1" "168.000","Sy","Granite Pavers Removed And Relaid","706.12" "150.000","Sy","Brick Sidewalk On Hot Mix Asphalt Setting Bed","706.26" "720.000","Sy","Permeable Pavers","706.7" "7.000","Ea","Park Bench","707.1" "2.000","Ea","Trash Receptacle","707.2" "4.000","Ea","Bicycle Rack","707.9" "25.000","Ea","Bound - Lettered Granite","710.3" "2.000","Ea","Bound Removed And Stacked","712." "1.000","Ea","Mail Box Removed And Reset","715.1" "4.000","Ea","Sign Removed And Reset","734." "57.000","Mo","Engineers Field Office And Equipment (Type a)","740." "8.000","Ea","Pedestrian Bus Shelter","745." "1.000","Ls","Mobilization","748." "3000.000","Cy","Loam Borrow","751." "84.000","Cy","Bioretention Soil (Biosoil)","751.43" "17288.000","Sy","Compost Topdressing","751.72" "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "21450.000","Sy","Seeding","765.01" "3396.000","Sf","Planting & Seeding @ Bio-Retention Area","765.8" "72.000","Day","Tree Watering","766.2" "6490.000","Ft","Sediment Control Barrier","767.121" "83.000","Cy","Aged Pine Bark Mulch","767.6" "1.000","Ls","Bioretention Area","772.03" "16.000","Ea","Elm - American 'Princeton' - 3.5 Inch Caliper","775.028" "2.000","Ea","Linden - Little Leaf 2-2.5 Inch Caliper","775.147" "16.000","Ea","Linden - Little Leaf 3-3.5 Inch Caliper","775.151" "34.000","Ea","Locust - Honey - 'Skyline' 2-2.5 Inch Caliper","775.437" "24.000","Ea","Locust - Honey - 'Skyline' 3-3.5 Inch Caliper","775.441" "4.000","Ea","Maple - Red - 'Red Sunset' 2-2.5 Inch Caliper","776.557" "38.000","Ea","Maple - Red - 'Red Sunset' 3-3.5 Inch Caliper","776.561" "1.000","Ea","Oak - Northern Red 2-2.5 Inch Caliper","777.036" "5.000","Ea","Oak - Northern Red 3-3.5 Inch Caliper","777.043" "3.000","Ea","Scarlet Oak - 3.5 Inch Caliper","777.243" "2.000","Ea","White Oak - 3.5 Inch Caliper","777.334" "15.000","Ea","Dogwood - Pink 'Rubra' 3-3.5 Inch Caliper","780.159" "9.000","Ea","Shad Tree - Canadian - 5-6 Foot Clump","783.05" "7.000","Ea","Tulip Tree 2.5-3 Inch Caliper","783.442" "27.000","Ea","Tulip Tree 3-3.5 Inch Caliper","783.443" "3.000","Ea","Tupelo - 3.5 Inch Caliper","783.469" "2.000","Ea","Zelkova - 'Village Green' 2-2.5 Inch Caliper","783.645" "1.000","Ea","Zelkova 'Village Green' - 3.5 Inch Caliper","783.648" "821.000","Ea","Juniper - Bar Harbor 12-15 Inch","786.079" "11.000","Ea","Dogwood - Redosier 2-3 Feet","790.633" "11.000","Ea","Lilac - Dwarf - 'Palibin' - 5 Gallon","792.447" "18.000","Ea","Winterberry 'Red Sprite' - 24-30 Inch","795.158" "1850.000","Ft","2 Inch Electrical Conduit Type Nm Plastic - (Ul)(Ms)","804.22" "5436.000","Ft","3 Inch Rigid Plastic Conduit For Traffic Signals","804.301" "13250.000","Ft","3 Inch Electrical Conduit Type Nm Plastic - (Ul)(Ms)","804.33" "1950.000","Ft","Conduit Encased In Concrete - Sd 4.041","810." "1900.000","Ft","3 Inch Conduit (Single) Encased In Concrete","810.32" "120.000","Ea","Traffic Handhole 12 Inch x 24 Inch","811.301" "200.000","Ea","Pullbox Pre-Cast 12 x 24 (Municipal Standard)","811.331" "25.000","Ea","Pull Box Adjusted","811.351" "25.000","Ea","Pullbox Frame And Cover (Sidewalk) Remove And Replace","811.363" "32.000","Ea","48 Inch Light Standard Base - Pre-Cast (Municipal Standard)","812.092" "28.000","Ea","84 Inch Light Standard Base - Pre-Cast For Roadway And Modified Pole","812.093" "209.000","Ea","Light Standard Base - Removed And Disposed","812.097" "70.000","Ea","48 Inch Light Standard Base - Pre-Cast (Municipal Standard) In Sod Area","812.158" "58.000","Ea","84 Inch Light Standard Base - Pre-Cast (Municipal Standard) In Sod Area","812.159" "7.000","Ea","Control Cabinet Base - Pre-Cast (Municipal Standard)","812.201" "7.000","Ea","Utility Manhole Break For Lighting Controller","812.211" "61.000","Ea","Traffic Signal Post Foundation","812.301" "31.000","Ea","Type Ii Mast Arm Foundation","812.411" "3.000","Ea","Traffic Signal Control Cabinet Foundation Ground Mount (For Type Ca,Cb Cabinet)","812.501" "8.000","Ea","Traffic Signal Control Cabinet Foundation Ground Mount (For Type Cc,Cd Cabinet)","812.502" "21800.000","Ft","Wire Type 8 No. 10 Direct Burial","813.40" "53100.000","Ft","Wire Type 8 No. 4 Direct Burial (Municipal Standard)","813.431" "200.000","Ea","Street Lighting Non Conductive Insulating Sleeve (Ms)","813.65" "200.000","Ea","Ground Rod","813.701" "1.000","Ls","Interconnect Cable System","813.79" "1.000","Ls","Traffic Signal Reconstruction Location No. 1","816.01" "1.000","Ls","Traffic Signal Reconstruction Location No. 2","816.02" "1.000","Ls","Traffic Signal Reconstruction Location No. 3","816.03" "1.000","Ls","Traffic Signal Reconstruction Location No. 4","816.04" "1.000","Ls","Traffic Signal Reconstruction Location No. 5","816.05" "1.000","Ls","Traffic Signal Reconstruction Location No. 6","816.06" "1.000","Ls","Traffic Signal Reconstruction Location No. 7","816.07" "1.000","Ls","Traffic Signal Reconstruction Location No. 8","816.08" "1.000","Ls","Traffic Signal Reconstruction Location No. 9","816.09" "1.000","Ls","Traffic Signal Reconstruction Location No. 10","816.10" "27230.000","Ft","Wire Loop Installed In Roadway","819.831" "101.000","Ea","Post - Fluted Steel - Bncp, 13' - 4 Inch Post Height (Ms)","821.852" "87.000","Ea","Post - Fluted Steel - Bbsp, 25'-6 3/4 Inch Post Height (Ms)","821.866" "87.000","Ea","Bracket Arm - Boston Boulevard Pendant Style, Single (Ms)","821.951" "72.000","Ea","Bracket Arm - Boston Boulevard Pendant Style, 3' Length, Single (Ms)","821.953" "7.000","Ea","Street Lighting Controller Remove And Transport","823.607" "7.000","Ea","Street Lighting Controller (Ms) With Electronic Controlled Panel Board","823.612" "211.000","Ea","Street Lighting Post And Luminaire Remove And Transport","823.72" "72.000","Ea","Luminaire - Boston Pendant Style, 75w Led (Ms)","823.952" "87.000","Ea","Luminaire - Boston Pendant Style, 100w Led (Ms)","823.955" "101.000","Ea","Luminaire - Cast Iron Bnc, 75w Led Single (Ms)","823.999" "3.000","Ea","Fire Alarm Base And Middle Section Adjusted","826.54" "1.000","Ea","Police Callbox Remove And Reset","826.64" "110.000","Sf","Roadside Guide Sign (g) - Aluminum Panel (Type b)","829." "1730.000","Sf","Warning-Regulatory And Route Marker - Alum. Panel (Type a)","832." "202.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "200.000","Hr","Roadway Flagger","850.41" "1113.000","Sf","Safety Signing For Traffic Management","852." "200.000","Ft","Temporary Pedestrian Barricade","852.11" "2000.000","Ea","Temporary Pedestrian Curb Ramp","852.112" "120.000","Sf","Tow Zone No Parking Sign","852.12" "14.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "60.000","Ft","Temporary Barrier","853.2" "60.000","Ft","Temporary Barrier Removed And Reset","853.21" "100.000","Day","Temporary Illumination For Work Zone","853.8" "68200.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "600.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "3100.000","Sf","Pavement Marking Removal","854.1" "4.000","Ea","Temporary Wheelchair Ramp","855." "256.000","Day","Arrow Board","856." "336.000","Day","Portable Changeable Message Sign","856.12" "86671.000","Day","Reflectorized Drum","859." "1260.000","Sf","Pavement Arrow Reflectorized White (Painted)","864." "6990.000","Sf","Pavement Arrows And Legends Refl. White (Thermoplastic)","864.04" "25640.000","Sf","High Friction Surface Treatment-Green (Bike Lanes)","865.01" "10600.000","Sf","Crosswalks And Stop Line Refl. White (Thermoplastic)","865.1" "20100.000","Ft","4 Inch Reflectorized White Line (Thermoplastic)","866.104" "850.000","Ft","8 Inch Reflectorized White Line (Thermoplastic)","866.108" "800.000","Ft","12 Inch Reflectorized White Line (Thermoplastic)","866.112" "12370.000","Ft","4 Inch Reflectorized Yellow Line (Thermoplastic)","867.104" "12.000","Ft","8 Inch Reflectorized Yellow Line (Thermoplastic)","867.108" "28.000","Ea","18 Inch Street Name Sign (Boston) On Mast Arm","874.0018" "11.000","Ea","9 Inch Street Name Sign (Boston) Blank","874.009" "258.000","Ea","Traffic Sign Removed And Stacked","874.4" "4.000","Ea","Sign Post 2 Inch Steel","877.3" "50.000","Cy","4000 Psi, 3/4 In., 610 Cement Concrete","904." "6.000","Cy","Concrete Steps","904.01" "65.000","Cy","5000 Psi, 3/4 Inch, 685 Hp Cement Concrete","904.3" "4800.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |