Similar Projects
The Pointe at 53rd
New Construction
Conception
Murray, UT 84107

Sage Valley Apartments Phase 2
New Construction
Conception
West Valley City, UT

370 Millennium Tower
New Construction - 284,500 SF
Design
Salt Lake City, UT 84111

370 Millennium Tower
New Construction - 284,500 SF
Design
Salt Lake City, UT 84111

Tradition Point Apartments
New Construction
Bidding
Murray, UT 84107

Alta Depot
New Construction - 434,303 SF
Post-Bid
$10,000,000 CJ est. value
Salt Lake City, UT 84102

The Zephyr
New Construction - 99,892 SF
Post-Bid
$6,827,300 est. value
Salt Lake City, UT 84101

Construction Services of a West Jordan Community Arts Center
New Construction
Results
$5,800,000 est. value
West Jordan, UT 84088

DFCM Construction - Fairpark Grand Building Elevator Modernization
Renovation
Results
Less than $150,800 est. value
Salt Lake City, UT 84116

The Residences at Sugar Alley
New Construction - 240,148 SF
Construction
$12,027,302 est. value
Salt Lake City, UT 84106

The Revival
New Construction - 223,852 SF
Construction
$7,500,000 est. value
Salt Lake City, UT

800 South & State
New Construction
Pending Verification
Salt Lake City, UT

West End
New Construction
Pending Verification
Salt Lake City, UT

Mixed Use Project
New Construction
Conception
Salt Lake City, UT 84102

Cottonwood Mall Redevelopment
New Construction
Design
Holladay, UT 84117

Last Updated 01/19/2022 04:22 PM
Project Title

Salt Lake Crossing

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT   (Salt Lake County)
Category(s) Entertainment/Recreation, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club
Contracting Method
Project Status Permitting, Construction Commenced January 2022
Bids Due View project details and contacts
Estimated Value $12,000,000 to $13,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

306,775 SF - 1 Apartments/Condominiums, 5 Stories Above Grade, 264,119 SF New Construction 300 Unit(s), 1 Clubhouse/Social Club, 7 Stories Above Grade, 42,656 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents