Similar Projects
Sensus Water Meters, Supplies, Automated Reading Equipment and Testing and Repair Services
Infrastructure
Bidding
Wallingford, CT

Iron Ductile Pipe
Infrastructure
Bidding
Waterbury, CT 06708

Ward-Heitmann House Museum Drainage Improvements
Renovation
Post-Bid
New Haven, Shelton, West Haven, CT 06516

Lower Mill River Interceptor Rehabilitation - Phase 1
Post-Bid
New Haven, CT

Water System Audit and Leak Detection Survey
Results
Waterbury, CT

Dale Avenue Drainage Improvements
Results
Waterbury, CT

Drainage Improvements at Philip Place and Anthony Road
Infrastructure
Post-Bid
North Haven, CT

Miscellaneous Concrete Repairs, Waterproofing and Drainage Repairs at the Union Station Parking Garage
Results
New Haven, CT 06519

On-Call Water Utility Repair Service
Term Contract, Infrastructure
Post-Bid
Waterbury, CT

Water Meters
Results
New Haven, CT

Installation Of Ductile Iron And Hdpe Water Mains
Infrastructure
Post-Bid
New Haven, CT

Branford Point Seawall and Wharf Repair
Results
Branford, CT

Lake Gaillard Water Treatment Plant Raw Water Valves Replacement
Infrastructure
Post-Bid
North Branford, CT 06471

Great Brook Culvert Rehabilitation Project - Phase 1
Results
Waterbury, CT

Crestwood Drive Water Main Extension Project
Infrastructure
Post-Bid
Naugatuck, CT 06770

Reported 07/08/2022 06:10 AM
Project Title

Contractor - Steam Supply Double Block and Bleed Station With Bypass Line Installation

Physical Address View project details and contacts
City, State (County) West Haven, CT 06516   (New Haven County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Pre-Solicitation, Construction Start Expected July 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a double block and bleed valve arrangement in the 6-inchhigh pressure steam supply header to building 2. The assembly shall include a condensate drip pot, inverted bucket type steam traps), vent and drain lines where appropriate Additional or upgraded pipe hanger supports for the new assembly shall be included and installed if needed Perform pressure test and x-ray weld examinations of final assembly as required by VA specifications. Install insulation on bare piping when installation and testing is complete. 2.2 Specific Requirements Contractor shall provide all parts, materials and equipment required to complete this scope of work.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents