Similar Projects
Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$1,319,000 CJ est. value
Harrold, SD 57536

Install Cured in Place Pipe Lining in Condenser Water Piping
Term Contract
Design
Pierre, SD 57501

North Bend Wind Project
New Construction, Infrastructure
Design
$200,000,000 CJ est. value
Pierre, SD 57501

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP Constructin Manager at Risk Service - Kinsman Building Addition
Addition, Demolition, Infrastructure - 23,000 SF
Post-Bid
$1,300,000 CJ est. value
Pierre, SD 57501

2022 Pipe, Valves, Fittings and Hydrants
Infrastructure
Results
Pierre, SD

Black Hills Drive Extension
Infrastructure
Results
$500,000 est. value
SD

Access Connection/Road Improvement - Cow Creek Recreation Area
Infrastructure
Construction
$275,952 CJ est. value
Pierre, SD 57501

OAHA YMCA Phase 2 Addition
Addition, Demolition, Build-out, Infrastructure
Pending Verification
$500,000 CJ est. value
Pierre, SD 57501

Urban Grading, Curb and Gutter, ADA, Signals, Storm Sewer, Lighting, AC Surfacing
Infrastructure
Conception
$15,094,000 CJ est. value
Harrold, SD 57536

2024 Areawide Pipe Work Projects
Infrastructure
Design
$710,000 CJ est. value
Pierre, SD 57501

RFP Design - Architectural and Engineering Services Grounds ,Stormwater,Water Line,Sewer
Infrastructure
Post-Bid
$3,200,000 CJ est. value
Pierre, SD 57501

Access Area Construction, Whitewood Lake Access Area
Infrastructure
Results
$400,000 est. value
Pierre, SD

Mill, AC Resurfacing, Pipe Work
Infrastructure
Conception
$4,711,000 CJ est. value
Harrold, SD 57536

Last Updated 05/04/2023 11:39 AM
Project Title

Hill-Inside, Storm Sewer Upgrades

Physical Address View project details and contacts
City, State (County) Pierre, SD 57501   (Hughes County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $560,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Install 4" Asphalt Surfacing (2 Lifts) over 8" Aggregate Base Course (Sheet 13 Key Note 6). This project consists of the regrading for drainage improvements within the inside ofthe Hill area of the South Dakota State Penitentiary in Sioux Falls, SD. Improvements include concrete valley gutters, asphalt and concrete pavement, storm sewer and downspout/gutter work, as well as other work as identified in the technical drawings. August 9, 2024, Once any portion of the work begins, the Contractor will have 90 consecutive calendar days to complete the work. with Liquidated Damages: $1,200.00 per calendar day Final Completion: August 23, 2024 with Liquidated damages: $600.00 per calendar day Total value of material subject to tax: $0.00 In accordance with the provisions of SDCL 34-44-8, all bidders and contractors are hereby notified that to the best knowledge of the owner or those representing him in any capacity, this project does not involve asbestos containing materials (greater than 1%). Bidders are further instructed that no asbestos containing materials are to be installed in this project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents