Similar Projects
Saint Augustine Preparatory Academy Expansion
Addition - 11,000 SF
Design
Milwaukee, WI 53207

Darlington Elementary - Middle School Cafeteria Expansion
Addition - 1,700 SF
Bidding
Darlington, WI 53530

K-12 FEMA Safe Room
Addition
Bidding
Abbotsford, WI 54405

Parkside Elementary School Bid Package 1
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

Parkside Elementary School Bid #2
Renovation, Addition
Post-Bid
Fond du Lac, WI 54935

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Stateline Boys and Girls Club
New Construction, Renovation - 22,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

National Heritage Academies
New Construction - 45,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Waukesha, WI 53189

Oshkosh School District Secure Entry
Renovation
Bidding
Oshkosh, WI 54904

Roberts Elementary School Interior Remodeling and Renovations
Renovation
Post-Bid
Fond du Lac, WI 54935

Hamilton Elementary
Renovation, Addition - 18,000 SF
Results
La Crosse, WI 54601

Evans Elementary School Interior Remodeling and Renovations
Renovation
Post-Bid
Fond du Lac, WI 54935

2021 Elementary School Renovation
Renovation
Results
New Holstein, WI 53061

Hatley Elementary School Renovation
Renovation
Post-Bid
Hatley, WI 54440

Last Updated 01/03/2022 04:08 PM
Project Title

La Farge School District

Physical Address View project details and contacts
City, State (County) La Farge, WI 54639   (Vernon County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of additions and renovations to an existing K-12 educational building Work includes but is not limited to: demolition, concrete, slab on grade, slab on deck, masonry, CMU, brick, cast stone, structural steel, steel joist, steel deck, cold formed steel framing, decorative handrail, insulated EPDM roof, EIFS, foamed-in-place insulation, rigid insulation, aluminum storefront, curtainwall, accordion folding door, gypsum assemblies, acoustic tile ceiling, resilient flooring, tile, fluid applied flooring, carpet, sound absorbing units, and hydraulic elevator. Site work includes masonry retaining wall, site furnishings, concrete paving, and rerouting of utilities including gas, electric, telephone, and storm drain. Plumbing work includes removal and replacement of existing systems and extending systems to new locations. HVAC work includes new boilers, make up air units, roof top units, air handling units, unit vents, unit heaters, roof exhausters, ductwork and piping. Electrical work includes new electrical service, new fire alarm system, replacement of light fixtures and power wiring. The bidding documents describe five alternates. One of the alternates includes installation of a three stop ADA platform lift. Another of the alternates includes an interior folding glass storefront unit.

Details

Elementary School, Addition, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents