Similar Projects
Last Updated | 08/30/2022 06:06 PM |
Project Title | Watermain Replacement, Waldo Boulevard Viaduct |
Physical Address | View project details and contacts |
City, State (County) | Manitowoc, WI 54220 (Manitowoc County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected March 2023 |
Bids Due | View project details and contacts |
Estimated Value | $600,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of 08/30/2022 After review of this project, MPU has decided to regroup and replace the 10" watermain under the R/R tracks. This will require obtaining a permit from CN RailRoad, and revise the plans and specs to show the new 12" main and ja. Therefore, this bid is being cancelled at this time Site Directions: The Waldo Boulevard Viaduct watermain is in the south R.O.W. of Waldo Boulevard, in a grassy field between Fleetwood Drive and N 23rd St. Supply and install approximately 1450 feet of 12" PVC watermain on the south right-of-way on Waldo Boulevard, from Fleetwood Drive to N 23rd Street. Abandon the existing 10" cast iron watermain in place. Est. Completion Date: Nov. 18, 2022 |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |