Similar Projects
Treasure Island Elementary School Community Park - Construction - CP23-07 - North Bay Village
New Construction, Infrastructure
Conception
$2,703,546 CJ est. value
North Bay Village, FL 33141

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Design-Build Services for Roadway Improvements to NE 2nd Avenue
Results
Less than $10,307,626 est. value
Miami, FL 33128

SR 826 - Palmetto Expressway Capacity Improvement Project (FPID)
Results
Miami Lakes, FL 33014

Uni Tower Mixed Use / Miami
New Construction, Infrastructure - 38,000 SF
Construction
$43,000,000 CJ est. value
Miami, FL 33132

Brickell Gateway Tower
New Construction, Infrastructure
Construction
$150,000 CJ est. value
Miami, FL 33130

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Pending Verification
$10,000,000 CJ est. value
Miami Beach, FL 33140

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Pending Verification
$10,000,000 CJ est. value
Miami Beach, FL 33140

M-Tower
New Construction, Infrastructure, Renovation - 10,531 SF
Design
$170,000,000 CJ est. value
Miami, FL 33130

Traffic Circle Improvements at SW 62 Avenue and SW 48 Street
Post-Bid
$318,000 est. value
Miami, FL 33134

Design-Build Adaptive Re-Use Infrastructure Redevelopment
Results
Doral, FL 33178

Last Updated 02/14/2023 05:10 PM
Project Title

Safe Route to Schools Locations Phase 22 FM 439895-1

Physical Address View project details and contacts
City, State (County) Miami Gardens, FL 33056   (Miami-Dade County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $161,887 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 14 2023, this project has been cancelled. No other information at this time. (Contractor must obtain and submit all permits prior to performing any work). Work includes but is not limited to providing the supervision, labor, required materials, equipment, tools, operations, and documentation for installing pedestrian signal heads and push button detection at existing signalized intersections, electrical power service assemblies, school speed zone signs and flashing beacons, school crosswalk signs, pavement markings, sidewalk, curb and gutter, pedestrian ramps, and other related tasks pursuant to the requirements of the Contract Documents. Q & A deadline: Feb 02, 2021 2:00:00 PM EST All RFI requests should be e-mailed to Katherine.Fernandez@miamidade.gov while copying the Clerk of the Board (clerkbcc@miamidade.gov) This project is subject to the criteria and conditions of federal funded projects. Location of Work: The locations for work to be performed under the terms of this Contract are listed at the following Schools located in Miami-Dade County: 1. North Twin Lakes Elementary, 625 W 74th Pl, Hialeah, FL 33014 2. Miami Garden Elementary, 4444 NW 195th St, Miami Gardens, FL 33055 3. Myrtle Grove Elementary School, 3125 NW 176th St, Miami Gardens, FL 33056 4. Bunche Park Elementary School, 16001 Bunche Park School Dr, Opa-locka, FL 33054 Disadvantaged Business Enterprise (DBE): A race neutral Disadvantaged Business Enterprise (DBE) statewide aspirational goal of 10.65% percent exists for FHWA-assisted contracts. The Contractor shall comply with the requirements pursuant to 49 Code of Federal Regulations (CFR) Part 26 as implemented by the approved FDOT DBE Program. License Requirements: Primary: Electrical Contractor; General Engineering Sub: Concrete Engineering; Parking Strip Painting; Pavement Marking; Painting Type of Contract: Multiple Trade Method of Award: Lowest Responsible Bidder Method of Payment: Scheduled Monthly Payments Insurance Required: YES Additional Insurance Required: YES If Yes - Minimum Coverage: $1,000,000.00 Performance & Payment Bond Required: YES Bid Bond Required: YES SBE-Con. Requirements: NO Percentage: 0.00% SBD Certificate of Assurance Form Required: NO DBE Participation: YES Percentage: 10.65% DBE Subcontractor Forms Required: YES CWP Requirements: NO Percentage: 0.00% SBE-S Requirements NO Percentage: 0.00% SBE-G Requirements NO Percentage: 0.00% Liquidated Damages: YES $$ Per Day: $1,170.00 Calendar Days for Project Completion: 365 FM No. 439895-1

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents