Similar Projects
Sidewalk and Curb Replacement
Post-Bid
$5,000 est. value
Winter, WI 54896

2021 Sidewalk Improvement Project
Post-Bid
$103,605 est. value
Portage, WI

Boardwalk Replacement
Results
De Forest, WI 53532

City Owned Parking Lot Rehabilitation - East Lawn Cemetery
Results
Beloit, WI 53511

Burnham Pointe Park
Post-Bid
Less than $231,532 est. value
West Allis, WI

Motor Vehicles Storage Compound Expansion
Results
$700,000 est. value
Mosinee, WI 54455

UW - Stevens Point at Wausau Parking Lot Reconstruction
Post-Bid
Wausau, WI 54401

Privately Owned Vehicle Parking Improvements - MEP Bidders
Results
$878,000 est. value
Marshfield, WI

Sharon Hall Aluminum Handicap Ramp
Post-Bid
Sharon, WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

2021 Kansas Street - Street and Utility Improvements
Post-Bid
Horicon, WI 53032

Menomonee Park DEA Asphalt and Concrete Paving
Results
Menomonee Falls, WI 53051

2021 Curb, Gutter and Sidewalk
Term Contract
Post-Bid
Reedsburg, WI

Parking Lot
Results
Milwaukee, WI 53205

Parking Area Graveling And Drainage
Post-Bid
Friendship, WI 53934

Reported 02/04/2022 12:00 AM
Project Title

City Of Lax - Greenbay Sw And Curb Replacement

Physical Address View project details and contacts
City, State (County) State-Wide: WI
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of replacing approximately 6,000 square feet of sidewalk and curb ramp panels for replacement. Items to bid include 6,000 square feet of flatwork in 4-inch, 5-inch and 6-inch depths. Restoration of private grass areas throughout. The responsibility of restoring private grass areas falls to the contractor awarded this bid. Wisconsin Department of Transportation (WisDOT) shall be responsible for the removal and installation of the new curb & gutter, asphalt pavement, utilities, and boulevard restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents