Similar Projects
Waterset By Newland
New Construction
Conception
Apollo Beach, FL 33572

Kukla RV Resort
New Construction
Conception
Panama City Beach, FL

Highpointe PUD
New Construction - 588,000 SF
Design
Stuart, FL 34997

Palm Pike Crossing - Site Development
New Construction
Design
Palm City, FL 34990

Sereno Subdivision, Phases 7A and 7B and Phases 8A and 8B
Post-Bid
Wimauma, FL

Phase 1 Civil Site Work Edgewater East Community Development District
Post-Bid
FL

Construction Management at Risk Services for the Cecil Airport Eastside Development Site
New Construction - 370,000 SF
Results
Jacksonville, FL 32221

Site Maintenance
Results
Newberry, FL 32669

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Titusville Point - Site Development
New Construction
Construction
Titusville, FL 32780

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

The Preserve at Bannon Lakes
New Construction
Pending Verification
Saint Augustine, FL

Orange Lake Associates RV Resort Park
New Construction, Infrastructure
Conception
Citra, FL

The Shops at Waterbrooke - Phase I - Sitework
New Construction
Design
Clermont, FL 34711

Sandridge Phase 1 Infrastructure Project
Post-Bid
Jacksonville, FL 32099

Last Updated 03/30/2022 03:52 PM
Project Title

Island Way Well Site Development

Physical Address View project details and contacts
City, State (County) Jupiter, FL 33458   (Palm Beach County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $550,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, equipment, and materials necessary to perform site development for seven (7) water supply well sites, including but not limited to survey, clearing, grubbing, trimming, pruning, grading, earthwork, hauling, legal offsite disposal, construction of shell rock access roads and staging areas, concrete driveway aprons, asphalt driveways, +/- 145 LF 2” water service with meter box., +/- 690 LF 12” HDPE raw watermain and fittings, +/- 370 LF 12” HDPE formation water disposal main and fittings, 6’x6’x6.5’ (deep) precast concrete vault with aluminum hatch, +/- 42 LF 24” drainage RCP, +/- 56 LF 12” drainage CMP, precast concrete manhole, road rock and asphalt repairs, mill and overlay, concrete curb restoration, concrete sidewalk restoration, sodding, seed and mulch, and all other work intended and described by the Bidding Documents. The seven well sites are as follows: RO14 located in the SFWMD C-18 Canal right of way and adjacent to the PBC ERM Bluegill Trail, RO15 located at the south end of Jupiter Community Park (JCP) between Island Way and the west end of Church Street, RO16 located at the north end of JCP adjacent to Island Way, SA58 located on the south side of Washington Street near Jupiter Utilities, Parks and Public Works Field Offices, SA59 located on the west side of Island Way south of Rialto, SA60 located in the Rialto development off of Island Way, and SA62 located at the west end of Church Street on the south side of the Church Street extension

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents