Similar Projects
Partial Roof Replacement
Bidding
Huntington, WV

Gene Spadaro Juvenile Center - Roof Replacement Project
Alteration
Bidding
Mount Hope, WV 25880

Roof Replacement
Post-Bid
$206,550 est. value
Martinsburg, WV 25401

Roof Replacement on Specific Schools
Post-Bid
Lesage, WV 25537

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

James H Tiger Morton Juvenile Center - Roof Replacement Project
Alteration
Bidding
Dunbar, WV 25064

Simms School Elderly Apartment Roofing and Facade Historic Reconstruction and Restoration
Post-Bid
Huntington, WV

Student Center Roof Replacement
Results
Shepherdstown, WV 25443

Roofing Envelope Services
Post-Bid

Knutti Hall Roof and Foundation Improvements
Results
Shepherdstown, WV 25443

Hardway Hall and Hunt Haught Hall - Roof Renewals
Post-Bid
Fairmont, WV

Roof Replacement Project at Ranson Elementary School
Results
Ranson, WV 25438

Roofing MACC
Post-Bid

HAFE - Gutter & Downspout Cleaning
Results
Harpers Ferry, WV

Last Updated 05/12/2021 04:43 PM
Project Title

Sally Port Roof Replacement

Physical Address View project details and contacts
City, State (County) Martinsburg, WV 25401   (Berkeley County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of work Includes: Remove all existing roofing and flashings down to the metal deck. Replace any deteriorated metal decking. Install wood nailer on all open roof edges. Install 2 inch polyisocyanurate insulation according to manufacturer specifications. Install a totally adhered .060 EPDM Roofing System according to manufacturer specifications. Terminate rubber to masonry walls using water cut off and termination bar. Flash vent using EPDM Products. Fabricate and install new metal edging using 24-gauge metal following ES-1. Standards on all open roof edges. Fabricate and install new 6 inch k style gutter and a 3x4 Downspout. Clean up and remove all debris caused by this work. Provide owner with a 20-year NDL (No dollar Limit) warranty from manufacturer.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents