Similar Projects
Agriculture Lap & Shop
New Construction
Conception
$2,200,000 est. value
Dickinson, ND

Livestock Facility
New Construction
Conception
$1,963,000 est. value
Streeter, ND

NDSU Nodak Insurance Football Performance Complex
New Construction
Design
Fargo, ND 58105

North Dakota State University Bookstore Remodel
Renovation
Bidding
$750,000 est. value
Fargo, ND 58105

UND McCannel Hall Exterior Restoration Bid Package #2
Renovation
Bidding
$2,000,000 est. value
Grand Forks, ND 58202

Dakota College - Dining Hall Addition
Addition
Post-Bid
Bottineau, ND 58318

O'Kelly Hall - Bid Package 2
Renovation
Post-Bid
$9,000,000 est. value
Grand Forks, ND 58202

NDSU - RDC Kitchen Updates and Maintenance - Building 059
Renovation
Results
Fargo, ND 58105

Memorial Student Center Elevator
Results
Valley City, ND 58072

NDSU Nodak Insurance Football Performance Complex
New Construction
Construction
Fargo, ND 58105

Livestock Processing & Research Support Facility
New Construction
Conception
$1,529,000 est. value
Hettinger, ND

EERC East Front Entrance Remodel
Renovation
Post-Bid
Grand Forks, ND 58202

HREC Multi-Purpose Building Remodel
Renovation
Results
Hettinger, ND 58639

Sheep Feed Efficiency Facility
New Construction
Conception
$1,891,000 est. value
Hettinger, ND

UTTC Cafeteria
Renovation
Post-Bid
Bismarck, ND 58504

Reported 04/30/2022 12:00 AM
Project Title

Construction Manager - Agency Construction Manager Services - CTE Center

Physical Address View project details and contacts
City, State (County) Minot, ND 58701   (Ward County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Bidding, Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Assist the design consultants with the development of appropriate bid packages for construction work that can be completed prior to March 1, 2023. 2. Coordinate the work between various trade groups to provide timely and efficient execution of the project. 3. Review requests for payment to comply with Davis - Bacon federal payroll requirements as well as work completed or installed, and subsequently advise the design consultant of same. 4. Act in the fiduciary interests of the Owner (DCB) throughout the project to ensure performance of the various construction contracts is appropriate and reasonable. 5. Routinely meet with contractors, design consultant, and owner to ensure schedules and budgets are maintained.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents