Similar Projects
Grove, Wagener, and Laurens Streets Water Main Replacement Project
Post-Bid
Charleston, SC

Water and Sewer Utility Replacements
Infrastructure
Post-Bid
$400,000 to $600,000 est. value
Isle of Palms, SC

Dowden Court Wastewater Improvements
Infrastructure
Post-Bid
$850,000 est. value
Charleston, SC

Mt. Zion Elementary School - Auldreeke Road Water Main Improvements
Infrastructure
Results
$179,250 est. value
Johns Island, SC 29455

Construction of Summerville Avenue, Meeting Street, Tuxbury Lane Water Main Connectors
Post-Bid
Charleston, North Charleston, SC 29405

Seawater Intake Repair
Term Contract
Post-Bid
Charleston, SC 29412

2020 Line Stop Project on Meeting Street Road
Infrastructure
Results
North Charleston, SC 29405

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Palmetto Commerce Parkway Interchange Improvements Water Main Relocation
Post-Bid
Ladson, SC 29456

Anoxic Baffling Improvement Project
Infrastructure
Results
North Charleston, SC 29405

Bainbridge Avenue Water Main Replacement Project
Infrastructure
Post-Bid
Charleston, SC 29407

Check Valve Installation Project - SCPA Union Terminal
Infrastructure
Post-Bid
$200,000 est. value
Charleston, SC 29422

Road Work - E. Ashley Avenue, Folly Beach Drainage Improvements, Waterline Replacement and Sidewalk Replacement CTC
Infrastructure
Results
Charleston, SC

East Cooper Avenue to East Hudson Avenue Water Main Replacement
Infrastructure
Post-Bid
Folly Beach, SC 29439

Musc Ashley River Tower Water Intrusion
Alteration
Post-Bid
$300,000 est. value
Charleston, SC 29401

Last Updated 06/02/2022 01:31 AM
Project Title

2021 Force Main Rehabilitation Program

Physical Address View project details and contacts
City, State (County) North Charleston, SC   (Charleston County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Ingleside force main includes approximately 6,084 LF of 20-inch ductile iron pipe (DIP). The Northwoods Force Main includes approximately 5,045 LF of 30-inch DIP. The Turkey Creek force main includes 2,215 LF of 30-inch prestressed concrete cylinder pipe (PCCP). The portion of the Noisette force main being rehabilitated includes approximately 3,283 LF of 30-inch CIP and 596 LF of 30-inch C900 PVC. The project will include bypass pumping and other appurtenant activities.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents