Similar Projects
Public Works Building Boiler Replacement
Alteration
Bidding
San Antonio, TX 78214

Lighting, Mechanical and Fire Alarm Upgrades at Various Campuses
Post-Bid
Less than $397,000 est. value
San Antonio, TX 78250

Annual Contract for Boiler Inspections, Maintenance, and Repair Services for Other Locations - BESD
Term Contract
Post-Bid
San Antonio, TX

Water Softener Repair Services
Results
San Antonio, TX 78229

Annual Contract for Maintenance and Inspection of Boilers
Term Contract
Results
San Antonio, TX 78212

ADC Domestic Pumps and Water Softener Tower A, B and C Project
Infrastructure, Alteration
Post-Bid
San Antonio, TX 78207

Bubble Flow Meter System
Results
Less than $58,568 est. value
San Antonio, TX 78249

Fire Alarm and Mechanical Upgrades at Mary Lou Fisher Elementary School
Alteration
Post-Bid
San Antonio, TX 78245

SASH/SSLC Boiler Inspections
Term Contract
Results
Less than $300,000 est. value
San Antonio, TX 78223

Lighting, Mechanical and Sound System Upgrades at Coke R. Stevenson and Katherine Stinson Middle School
Alteration
Post-Bid
San Antonio, TX 78254

Boiler Replacement for Neal Elementary School
Results
San Antonio, TX 78201

Lighting Upgrades and Mechanical Upgrades
Alteration
Post-Bid
Helotes, San Antonio, TX 78238

Madonna Apartments Natural Gas Systems, Boiler Room & Parking Lot Improvements
Alteration
Results
San Antonio, TX 78216

B7429 Boiler Replacement
Term Contract
Post-Bid
San Antonio, TX 78236

J046--New - STX Water Softener Re-Bedding
Term Contract
Results

Last Updated 12/15/2021 11:27 PM
Project Title

2022 Chiller Replacement at Cooper Academy at Navarro

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78207   (Bexar County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $441,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the replacement of an air-cooled chiller, chilled water pumps, DDC Controls pertaining to the chiller and pumps. Installation of E-Gauge Meter and Surge Protector. The Work will be constructed under a single prime contract.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents