Similar Projects
Contractor - HVAC Repairs
Alteration
Design
$250,000 to $500,000 est. value
Westhampton Beach, NY 11978

Window Air Conditioning Units
Term Contract
Sub-Bidding
Lake Ronkonkoma, NY 11779

Charles B Wang Center RTU-6 Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Stony Brook, NY 11794

Furnish, Deliver and Start-Up a Complete Tower Air Stripper Water Treatment System
Alteration
Post-Bid
Southampton, Tuckahoe, NY

HVAC
Alteration
Post-Bid

Building Automation System Repairs (Hvac)
Alteration
Results
$250,000 to $500,000 est. value
Shoreham, NY 11786

Cooling Tower Maintenance and Water Treatment
Term Contract
Results
Stony Brook, NY

Montauk Playhouse HVAC Improvements Phase I
Renovation
Sub-Bidding
$200,000 CJ est. value
Montauk, NY 11954

Hvac Equipment Maintenance And Related Services
Term Contract
Post-Bid

HVAC Mechanical Upgrades Phase 2
Alteration
Results
Patchogue, NY 11772

HVAC System Replacement
Alteration
Post-Bid
Holbrook, NY 11741

Auditorium at East Islip Middle School
Alteration
Results
Islip Terrace, NY 11752

Cogeneration Systems Preventive Maintenance And Repair
Term Contract
Post-Bid
Deer Park, NY 11729

Replace Heating System
Alteration
Results
$500,000 to $1,000,000 est. value
Babylon, NY 11702

Repair of Boat House Furnace
Term Contract
Post-Bid
Babylon, NY 11702

Last Updated 03/27/2023 02:14 PM
Project Title

Interior Renovations and Mechanical Scope at Dayton Avenue and South Street Elementary School H-3

Physical Address View project details and contacts
City, State (County) Manorville, NY 11949   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $543,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

H-3.2, H-3.4 Non-bidders shall receive partial reimbursement, in an amount equal to the amount of the deposit, less the actual cost of reproduction of the documents if the set is returned in good condition within thirty (30) days following the award of the contract or the rejection of the bids covered by such plans and specifications. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record. The Provider takes no responsibility for the completeness of Contract Documents obtained from other sources. Contract Documents obtained from other sources may not be accurate or may not : contain addenda that may have been issued. Plan holders who have paid for hard copies ofthe bid documents will need to make the determination if hard copies of the addenda are required for their . use and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies ofthe bid addenda. Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "Eastport-south Manor Central School District", in an amount equal to ten percent (10%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such furthersecurity as may be required for the faithful performance of the contract Certification of Bonding Company is Required for This Bid, See Instructions for Bidders. It is the Board's intention to award the contract to the lowest qualified bidder in compliance with the specifications providing the required security who can meet the experience, technical and budget requirements. The Board reserves the right to reject any or all bids, waive any informality and to accept such bid which, in the opinion of the Board, is in the best interests ofthe School District.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents